Similar Projects
HDPE Pipe
Post-Bid
Montrose, PA 18801

Mattes Road Culvert Replacement
Post-Bid
Friendsville, PA 18818

Flood Restoration Project
Results
Montrose, PA 18801

Flood Restoration Projects
Results
Hop Bottom, PA 18824

State Game Lands #183 Shooting Range Improvements
Post-Bid
Palmyra, PA

Hop Bottom Sediment Basin Reconstruction Project
Results
Hop Bottom, PA 18824

Flood Restoration Project
Results
Susquehanna, PA 18847

Stacked Stone Wall - Fall Brook Run - Salt Springs State Park
Results
$100,000 to $500,000 est. value
PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Tinkerbrook & Welch Hill Roads Aluminum Box Culverts General Construction Contract
Results
$200,000 to $250,000 est. value
Clifford, PA 18413

Drainage Work on Peterson Road
Results
$117,000 est. value
Dimock, PA 18801

FEMA Stream Restoration Project
Results
Hop Bottom, PA 18824

Herb Button Road Culvert Replacement Project
Results
Springville, PA 18844

SR 1021 Emergency Pipe Replacement
Results
$1,000,000 to $2,499,999 est. value
PA

SR 171 Emergency Pipe Replacement
Results
Less than $99,999 est. value
PA

Last Updated 02/05/2021 06:31 AM
Project Title

SR 11 Emergency Slide Repair

Physical Address View project details and contacts
City, State (County) PA   (Susquehanna County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $499,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction of an Emergency Repair Of Embankment On Sr 11 In Great Bend Township, Susquehanna County. The project purpose is to repair flood damage and construct the new stabilize embankment to protect the road shoulder for motorist safety. The stream embankment will restore for roadway embankment and safety to the motorists. In addition, the project will stabilize sub-surface material under roadway and embankment to prevent future failure and reduce the costs of future maintenance work. Other work includes to complete a mud sill, construct rock construction entrances and deposition removal. 0201-0001lump Sum1.000 01na Clearing And Grubbing 0203-0001cubic Yard161.000 01nc Class 1 Excavation 0205-0263cubic Yard39.000 01nc1 Selected Borrow Excavation Rock, Class r-3 0205-0268cubic Yard643.000 01nc1 Selected Borrow Excavation Rock, Class r-8 0212-0014square Yard560.000 01nc3, h, m2 Geotextile, Class 4, Type a 0350-0106square Yard39.000 01nc, e Subbase 6" Depth (No. 2a) 0608-0001lump Sum1.000 01nx Mobilization 0609-0003lump Sum1.000 02nx Inspector`s Field Office And Inspection Facilities, Type b 0609-0009lump Sum1.000 02nxstd Equipment Package 0620-0503linear Foot725.000 01nc1, j Remove Existing Guide Rail (Contractor`s Property) 0620-1600linear Foot725.000 01nj Type 31-s Guide Rail 0627-3020linear Foot1,200.000 01nj1 Temporary Barrier, Test Level 3, Barrier Deflection Distance < /=2` 0686-0040lump Sum1.000 01nx Construction Surveying, Type c 0689-0005lump Sum1.000 01nx Cpm Schedule, With Updates 0690-0001dollar1,000.000$1.00$1,000.0001yx Internal Facilitation 0696-0610each2.000 01nj1 Temporary Impact Attenuating Device, Type v (Standard), Test Level 3 0845-0001dollar5,000.000$1.00$5,000.0001ym2 Unforeseen Water Pollution Control 0855-0003each2.000 01nm2 Pumped Water Filter Bag 0867-0012linear Foot150.000 01nm2 Compost Filter Sock, 12" Diameter 0901-0001lump Sum1.000 01nq Maintenance And Protection Of Traffic During Construction 0901-0320linear Foot6,600.000 01no 4" Standard Pavement Markings, Paint & Beads, Yellow 0901-0330linear Foot1,600.000 01no 4" Standard Pavement Markings, Paint & Beads, White 0901-0451each2.000 01nq 3-Line Changeable Message Sign Without Telecommunications 0937-0107each29.000 01nj, r Guide Rail Mounted Delineator Type b, (w/w) 0937-0114each29.000 01nj, r Guide Rail Mounted Delineator Type d, (w/w) 0937-0203each100.000 01nj1, r Barrier Mounted Delineator, Side-Mount Type o, (w/b) 0937-0213each100.000 01nj1, r Barrier Mounted Delineator, Top-Mount Type Wz, (o/b) 0963-0004linear Foot15,625.000 01no2, o3 4" Pavement Marking Removal 0964-0001linear Foot825.000 01no 4" White Epoxy Pavement Markings 0964-0002linear Foot6,600.000 01no 4" Yellow Epoxy Pavement Markings 9000-0001linear Foot150.000 01nm2proj Temporary Cofferdam 9000-0002lump Sum1.000 01nc1, Hproj Mud Sill 9000-0003each2.000 01nxstd Covid-19 Safety Plan Sign 9000-0020each1.000 01nc1proj Rock Construction Entrance/Access Road Sr 0011 Seg 0500 Off 1050 9000-0021each1.000 01nc1proj Rock Construction Entrance/Access Road Sr 0011 Seg 0500 Off 1240 9000-0022cubic Yard200.000 01nc1proj Deposition Removal

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents