Similar Projects
Wrong Way Driving and Low Bridge Clearance Countermeasures
New Construction
Bidding
$900,000 est. value

Wrong Way Driving and Low Bridge Clearance Countermeasures
New Construction
Bidding
$900,000 est. value

Cazenovia Street Over Cazenovia Creek Bridge Rehabilitation, BIN 2260690
Post-Bid
Buffalo, NY 14202

South Ogden Street Bridge Replacement Over the Buffalo River (BIN 2260730)
Post-Bid
Buffalo, NY 14200

Cedar Street BR (261-01) Over Ledge Creek Replacement
Results
Buffalo, NY 14202

NY Rte 93 over Twelve Mile Creek and NY Rte 425 over E Branch of Twelve Mile Creek Bridge Replacements NY Rte 18 Slope Stabilization
Results
Wilson, NY 14172

Bridge Painting and Steel Repairs of Leydecker Road Bridge (BIN 3328840) over Cazenovia Creek
Post-Bid
West Seneca, NY

Bridge Bearing Maintenance and Lubrication
Results
Lockport, NY 14094

Niagara Street (NY Route 266) Over Scajaquada Creek Bridge Rehabilitation
Post-Bid
Buffalo, NY 14269

Bridge Deck Overlay Project 2020
Results
Lockport, NY 14094

Replacement of Dewey Avenue Bridge over CSXT (Bin 2260540)
New Construction
Post-Bid
NY

Bridge Cleaning and Deck Sealing 2020
Results
Lockport, NY 14094

General Bridge Repairs in Towns of Allegany and Concord
Results
Less than $3,100,000 est. value
Allegany, NY 14706

8.7 Miles of Asphalt Concrete Reconstructions on Rte 60 W/ Replacement Bridge over a Branch of the Cassadaga Creek
Results
Less than $1,200,000 est. value
Ellicott, NY 14720

Hillcroft Drive Bridge (BR 707) over Eighteen Mile Creek Replacement
Results
Buffalo, NY 14202

Last Updated 12/23/2020 02:35 AM
Project Title

General Bridge Repairs to 5 Bridges

Physical Address View project details and contacts
City, State (County) Lewiston, Tonawanda, West Seneca, NY (Erie, Niagara Counties)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will begin Phase 1 to maintain and preserve the region's bridges under the Bridge MBC (Maintenance-By-Contract) and Preservation Program in SFY 20/21. There are 5 bridges in the City of Niagara Falls, City of Tonawanda and in the Town of Lewiston and Town of West Seneca in Erie and Niagara County that will be rehabilitated.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents