Similar Projects
Farlington Fish Hatchery Addition
Addition, Demolition, Infrastructure
Design
$542,677 CJ est. value
Farlington, KS 66734

Grading and Surfacing
Infrastructure
Bidding
$5,000,000 CJ est. value
Ford, KS 67842

Grading and Surfacing
Infrastructure
Bidding
$5,000,000 CJ est. value
Ford, KS 67842

Parking Lot Resurfacing
Alteration
Post-Bid
Marion, KS

2022 City-Wide Pavement Maintenance Project
Infrastructure
Post-Bid
Baldwin City, KS

Mill and Overlay
Results
$831,421 est. value
KS

Chip Seal - K148 Fr K148/K28 JCT E TO K148/US81 JCT in RP and JW Co. Lgth 22.50 MI.
Infrastructure
Results

Flint Hills Orthopedic Expansion
Addition, Demolition, Renovation, Infrastructure - 5,000 SF
Pending Verification
$1,500,000 CJ est. value
Andover, KS 67002

Polo Fields South
New Construction, Infrastructure
Pending Verification
$8,200,000 CJ est. value
Overland Park, KS 66221

Grading and Bridge
Infrastructure
Bidding
$900,000 CJ est. value
Elk Falls, KS 67345

Hot Mix Asphalt (HMA) - Paving Surface Improvement Project
Infrastructure
Post-Bid
$293,000 est. value
Burlington, KS

Milling and HMA Overlay
Infrastructure
Results
KS

Archers Landing at Sundance Ridge Third Plat
New Construction, Infrastructure
Pending Verification
$180,000,000 CJ est. value
Overland Park, KS 66204

Greenhouse Shed
Demolition, New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Winona, KS 67764

Youth Sports Complex - ADA Sidewalks and Parking
Infrastructure
Post-Bid
$200,000 est. value
Lawrence, KS 66047

Last Updated 09/13/2022 02:58 PM
Project Title

CCLIP Pavement Surfacing Improvements, FY 2022

Physical Address View project details and contacts
City, State (County) Redwing, KS 67525   (Barton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $573,578 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project will generally consist of 19,234 SY of asphalt milling and asphaltic concrete overlay with 56 SY of full depth patching, 2,468 LF of mastic crack repair, 584 LF of thermal crack repair, 2 ADA wheelchair ramps, pavement marking, and traffic control. The Engineer is Professional Engineering Consultants, P.A. Their phone number 316-262-2691. Their address is 303 S. Topeka, Wichita, Kansas 67202. Contact Name & Email: Kristy Skaggs - Kristy.Skaggs@pec1.com

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents