Similar Projects
$MUNI-CIP-Construction of Facilities-city of Mount Vernon
New Construction, Infrastructure
Conception
$22,000,000 CJ est. value
Mount Vernon, WA 98273

South Commercial Avenue Corridor Plan - Phase II Commercial Avenue from 14th to 34th - City of Anacortes
Infrastructure
Conception
$60,000,000 CJ est. value
Anacortes, WA 98221

SR 9/Marsh Road to 2nd Street Vic - Widening
Infrastructure
Design
$130,600,000 est. value
Mount Vernon, WA 98273

I-5 / Maddox Creek - Fish Passage
Infrastructure
Design
$15,457,000 CJ est. value
Mount Vernon, WA 98273

32nd Street and M Avenue Intersection Improvements
Infrastructure
Post-Bid
Anacortes, WA 98221

2022 Waterline Replacements
Infrastructure
Post-Bid
$900,000 est. value
Anacortes, WA 98221

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Tower Site Readiness Phase III Project
Infrastructure
Results
Arlington, Bothell, Darrington, Everett, Monroe, WA 98241

Tommy Thompson Trestle and Causeway Replacement - City of Anacortes
Infrastructure
Construction
$350,000 CJ est. value
Anacortes, WA 98221

Tommy Thompson Trestle and Causeway Replacement - City of Anacortes
Infrastructure
Construction
$350,000 CJ est. value
Anacortes, WA 98221

Fidalgo Bay Road Reconstruction - City of Anacortes
Infrastructure
Conception
$9,500,000 CJ est. value
Anacortes, WA 98221

The Crossings Cottages Development
New Construction, Infrastructure
Design
$800,000 CJ est. value
Anacortes, WA 98221

Darrington Wood Innovation Center
Infrastructure
Post-Bid
$9,650,000 est. value
Darrington, WA

SR 20 Skagit River Fish Passage
Infrastructure
Results
$4,000,000 to $4,500,000 est. value
WA

R Avenue Safety and Mobility Improvements - City of Anacortes
Infrastructure
Conception
$5,427,164 CJ est. value
Anacortes, WA 98221

Last Updated 04/12/2023 10:15 AM
Project Title

Hoag / Laventure Intersection Improvements Project

Physical Address View project details and contacts
City, State (County) Mount Vernon, WA 98273   (Skagit County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes construction of an eight-phase traffic signal sys-tem, sidewalk, curb and gutter, storm drainage pipe and struc-tures, pavement rehabilitation., transit stops, utility coordina-tion, temporary traffic control, landscape restoration, and other required site work. Work lim-its generally extend within 400 feet from the Hoag/Laventure Intersection. Bid proposals must be pre-pared and submitted in accor-dance with Section 1-02 of the Project Specifications, and must be accompanied by a bid deposit or bid bond in the minimum amount of 5% of the proposal total. Work is anticipated to be begin by May 2023, with a duration of 60 working days. Questions about this proj-ect may be directed by email to William Bullock mvengineering@mountvernonwa.gov or by tele-phone at (360) 336-6204. The City of Mount Vernon reserves the right to reject any or all bid proposals, revise or cancel the work, complete the work by other means, or to postpone the bid award by up to thirty (30) days after bid opening. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents