Similar Projects
Air Cooled Condenser 1 (ACC1) and Air Cooled Condenser 2(ACC2) Tube Replacement
Alteration
Bidding
Rochester, MN 55904

Condensing Unit and Coil Replacement
Alteration
Bidding
Minneapolis, MN 55431

HVAC Filters
Term Contract
Post-Bid
Anoka, MN 55303

MBC - Alerton Controls Services
Term Contract
Post-Bid
Minneapolis, MN

HVAC System Replacement
Results
Grand Rapids, MN 55744

HVAC Upgrades
Results
Minneapolis, MN 55411

Blue Line LRT 32nd Street Crossover Switch Heater Replacement
Infrastructure
Bidding
Minneapolis, MN

Filter Replacement Services at PHA Properties
Post-Bid
Saint Paul, MN

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

Ramsey Elementary School Chiller Replacement
Alteration
Bidding
Ramsey, MN 55303

F108--Chemo Hood Vent Decontamination and Disposal St. Cloud
Post-Bid
Saint Cloud, MN

Johnson High School HVAC Replacement
Results
Saint Paul, MN 55106

McCarrons Center Generator Stack Improvements
Alteration
Bidding
Saint Paul, MN

Natatorium HVAC
Post-Bid
Rochester, MN

Franklin Elementary School HVAC Improvements 2020
Results
Mankato, MN 56001

Reported 07/03/2021 12:00 AM
Project Title

Chilled Water System Replacement - Commissioning Agent (CxA)

Physical Address View project details and contacts
City, State (County) Moorhead, MN 56563   (Clay County)
Category(s) Professional Services, Single Trades
Sub-Category(s) Commissioning, HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $593,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project requesting commissioning is anticipated to replace an existing water-cooled chiller system at MSUM’s Center for the Arts with a new air-cooled chiller system. This work would include the complete demolition of the existing cooling tower and condenser water piping system, as well as the existing chiller, and replacing it with a new air-cooled chiller. The predesign identified the need of a new 300-ton chiller, to be verified by design team using Future Weather Files instead of historical weather files.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents