Similar Projects
Estrella Jail Air Handling Unit Replacement
Alteration
Bidding
Phoenix, AZ 85009

HVAC Filter Replacement and Maintenance Services
Alteration
Bidding
$200,000 est. value
Scottsdale, AZ

HVAC Services and Repair
Term Contract
Post-Bid
Apache Junction, AZ 85119

HVAC System Coil and Air Handler Cleaning
Term Contract
Post-Bid
Phoenix, AZ 85003

PMA on Roof Top Chillers
Results
Pinon, AZ

HVAC Replacement
Results
Phoenix, AZ

LDS Encanto Meeting House -- HVAC
Renovation
Construction
$450,000 est. value
Phoenix, AZ 85035

Chemical Water Treatment
Post-Bid
Luke Air Force Base, AZ 85309

Construction Manager At Risk - Mark Wilmer Pumping Plant HVAC Replacement Project
Results
Phoenix, AZ

VA Tucson Replace Air Distribution Systems - Building 57
Post-Bid
Tucson, AZ

IHS1397567 Solicitation Preventive Maintenance and Repair for the Fume Hoods, PIMC
Results
Phoenix, AZ 85016

Robert Naylor K-8 School Kitchen A/C Conversion
Post-Bid
Tucson, AZ 85711

Remove and Replacement of HVAC Units
Results
$100,000 to $250,000 est. value
San Carlos, AZ

Utterback Middle School Kitchen A/C Conversion
Post-Bid
Tucson, AZ 85713

Chiller Equipment Preventative Maintenance and Repair
Results
Phoenix, AZ 85009

Reported 12/31/2021 12:00 AM
Project Title

Head Start HVAC Services - Fort Defiance and Chinle District

Physical Address View project details and contacts
City, State (County) Chinle, Fort Defiance, AZ   (Apache County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall be able to provide personnel who have been fully trained in all phases of HVAC, air vents and duct systems operation, maintenance, adjustment, and repair. Contractor’s personnel should also have familiarity with all types of components including controllers, electrical components, general preventative maintenance, repairs, and new installations of a variety of brands and models. The contractor and staff shall have expertise and experience in HVAC management to include the following but not limited to: Assessments and approvals needed for Head Start sites: 1. Complete an assessment on the condition of all HVAC units, air vents and ducts. 2. Upgrade and install HVAC units and the repair/replacement/cleaning of air vents and ducts that all applies to code and compliance standards, upon NHS approval. 3. Provide a scope of work and quote needed for all repairs. 4. Ensure a work order is provided by the Navajo Head Start Facility Support Service Coordinator before services are started. 5. All parts and supplies should be properly disposed in accordance with EPA regulations, upon approval of Navajo Head Start. Work: 6. Provide routine preventative HVAC maintenance services including air vents and duct services. 7. Major and minor repairs on the HVAC, air vents and duct systems. 8. Provide services when needed. 9. Provide new materials used on all HVAC, air vents and duct systems and shall be free of defects and pass inspection. 10. Provide labor, supplies, parts, and equipment for the HVAC, air vents and duct services. 11. Provide a schedule and detail of each location within the district of what needs repairs and upgrades. 12. Provide a timeline of when work is complete longer than 24 hours, dependent upon the supplies needed for the work. 13. Provide start up and inspections before start of services and after services have been completed. 14. Provide a sticker for HVAC system to verify service date. 15. Routine maintenance and repairs shall be done in accordance with federal and Navajo Nation regulations and codes. 16. Services to be performed and completed in accordance with industry acceptable standards. 17. Ensure work order is signed and returned to the Navajo Head Start Facility Support Service Coordinator. 18. Warranty Service: Extended warranty parts and labor (define maximum number of years available). 19. Dispose of all hazardous materials when repairs or changing any HVAC units. 20. Must comply with all Federal and Navajo Nation Regulations.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents