Similar Projects
MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

2021 Fairgrounds Paving Improvements
Infrastructure
Results
Washington, MO

2021 Ultrathin Bonded Wearing Course Program
Infrastructure
Results
Sullivan, MO

Hot Mix Overlay Thiebes, Old Highway 100, and Camp Mo Val Roads
Infrastructure
Post-Bid
$200,000 est. value
Union, MO 63084

Hot Mix Overlay-Thornton, Little Tavern, and Old Highway
Infrastructure
Results
MO

Fourth Street and Fair Street Overlay Project
Infrastructure
Results
Washington, MO 63090

Hot Mix Overlay - Diederich, Aunt Mary 'S, Lyon School and Project Roads
Infrastructure
Results
MO

Fixed Price Variable Scope Seal Coat
Infrastructure
Results
$250,000 to $500,000 est. value
MO

Fixed Price Variable Scope Seal Coat
Infrastructure
Results
$100,000 to $250,000 est. value
MO

Pavement Repair for 4 Ramps on I-44 Interchange at Route 47, Bridge Redecks and Bridge Replacement
New Construction, Infrastructure
Results
$2,500,000 to $5,000,000 est. value
MO

Kitchell Avenue Improvements
Infrastructure
Results
Saint Clair, MO 63077

Bush Creek Greenway Improvements Project
Infrastructure
Results
Washington, MO

Resurface
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
MO

Job Order Contract for Concrete Pavement Repair
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Last Updated 06/21/2022 12:35 AM
Project Title

2022 Overlay Project

Physical Address View project details and contacts
City, State (County) Washington, MO   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project includes milling for asphalt and NovaChip overlays, including localized reconstruction, base repairs, street apron, sidewalk, curb and gutter, stormwater, and ADA ramp construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents