Similar Projects
Pressure Washing Multiple Locations
Term Contract
Design
Canton, GA 30114

FY22 USACE Nashville District Design-Build and Design-Bid-Build Multiple Award Task Order Contract (MATOC)
Term Contract
Sub-Bidding
Nashville, TN 37219

FY22 USACE Nashville District Design-Build and Design-Bid-Build Multiple Award Task Order Contract (MATOC)
Term Contract
Sub-Bidding
Nashville, TN 37219

Pest Control Products and Services
Term Contract
Post-Bid

Pest Control Products and Services
Term Contract
Post-Bid

FY 2023 New Water Meter Installations
Term Contract
Sub-Bidding
Gainesville, GA 30501

Pest Control
Alteration
Post-Bid
Milledgeville, GA

Water Meters and Parts (Three (3) Year Multiyear Contract)
Term Contract
Sub-Bidding
Decatur, GA 30030

Unit Pest Control
Term Contract
Post-Bid
Quitman, GA

Elevator Preventive Maintenance - District 5
Infrastructure
Post-Bid
Brunswick, Savannah, GA

Pest Control Services
Term Contract
Post-Bid
Fitzgerald, GA 31750

Biosolids Handling and Disposal Services for Noonday and Northwest WRF
Term Contract
Post-Bid
Marietta, GA 30060

Last Updated 08/30/2022 05:31 AM
Project Title

Water Storage Tank Maintenance Program

Physical Address View project details and contacts
City, State (County) Manchester, GA 31816   (Meriwether County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The intent of this Request for Proposals (RFP) is to solicit and obtain the services of an experienced water storage tank maintenance firm to enter into a long-term, full service agreement with the City of Manchester to provide a maintenance program for the water storage tanks within the City's water system. This program shall include, but is not limited to, the following: inspection, rehabilitation, as-needed repairs, recoating, washout services and preventive maintenance. The selected firm shall enter into a long term agreement to assume full responsibility and accountability for all maintenance issues related to the City's water storage tanks. Any submittal should include all costs associated with labor, materials, equipment, overhead, profit, travel, reimbursables, inflation and all other expenses related to the provision of the necessary service as defined in the Scope of Work and the Schedule of Work. It is the intent of this RFP to determine the most qualified firm to which the City of Manchester could contract these services.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents