Similar Projects
Last Updated | 01/09/2022 10:56 PM |
Project Title | Prequalification of Contractors for the Edward Medard Reservoir Toe Drain Improvements Project |
Physical Address | View project details and contacts |
City, State (County) | FL (Hillsborough County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project work is presently anticipated to involve three phases of construction, including construction of vertical pressure relief wells connected to a new embankment toe drain system on the north side of the principal spillway discharge channel, a similar pressure relief well and toe drain system on the south side of the principal spillway discharge channel, and a filter blanket at the bottom of the existing West Surface Water Drainage Ditch. |
||||||||||||||||
Details | Dam/Tunnel, Renovation.
|
||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |