Similar Projects
Edward Medard Dam Discharge and Spillway Rehabilitation
Renovation, Infrastructure
Bidding
Plant City, FL 33567

L-4 Weir Replacement
Renovation
Bidding
$1,400,000 est. value
Palm Coast, FL 32164

Lake Apopka Duda Water Storage Improvements
Results
Less than $2,389,000 est. value

Lake Apopka Duda Water Storage Improvements
Results
Less than $2,389,000 est. value

Salinity Barrier Improvements
Results
Jupiter, FL

Tsala Apopka Golf Course Control Structure Modification
Results
$500,000 est. value
Inverness, FL 34450

Structures - S-160 and S-163 Gate Refurbishment Support
Results
$500,000 to $999,000 est. value
Tampa, FL 33610

Lake Pretty Structure Replacement
Results
Less than $200,000 est. value
Odessa, FL 33556

Hillsborough River Dam North Embankment Remediation
Results
$517,080 est. value
FL

Knowles Crossing
New Construction, Infrastructure
Results
$75,000 est. value
Clewiston, FL 33440

S-96 Rehabilitation
Renovation
Results
$2,784,130 est. value
FL

Wetland Outfall Weirs and Valves
Infrastructure
Results
Melbourne, FL 32940

Flood Gate Submersible Panel Replacement (Rivera Drive)
Renovation
Results
Coral Gables, FL 33114

Myakka River State Park - Upper Lake Restoration
Renovation
Results
Sarasota, FL 34241

Phase II Repairs to Lake Manatee Dam
Renovation
Results
$20,000,000 est. value
Bradenton, FL

Last Updated 01/09/2022 10:56 PM
Project Title

Prequalification of Contractors for the Edward Medard Reservoir Toe Drain Improvements Project

Physical Address View project details and contacts
City, State (County) FL   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project work is presently anticipated to involve three phases of construction, including construction of vertical pressure relief wells connected to a new embankment toe drain system on the north side of the principal spillway discharge channel, a similar pressure relief well and toe drain system on the south side of the principal spillway discharge channel, and a filter blanket at the bottom of the existing West Surface Water Drainage Ditch.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents