Similar Projects
Upcoming - Sleeve Valve
Term Contract, Alteration
Design
San Jose, CA

On-Call Tree Maintenance Services
Infrastructure
Post-Bid
$1,800,000 est. value
Oakland, CA

On-Call Citywide Bicycle Parking Installation and Maintenance
Alteration
Post-Bid
$330,000 est. value
Berkeley, CA

Placer County - Fire Sprinkler System Inspection, Testing and Maintenance
Alteration
Results
Auburn, CA

Heating, Ventilation, And Air Conditioning (HVAC) Duct System Maintenance Services
Alteration
Results
Torrance, CA 90501

Citywide as-Needed Repair Services
New Construction
Post-Bid
$10,000,000 CJ est. value
Santa Clara, CA

Digester Cleaning and Equipment Services
Alteration
Results
San Jose, CA

On-Call Closed-Circuit Television (CCTV) Video Inspections And Industrial Vacuum Cleaning And Jetting Services Program
Alteration
Post-Bid
$10,000,000 est. value
San Gabriel, CA 91778

Z--Stony Gorge Vault Pumping Services
Term Contract
Results
Elk Creek, CA 95939

Pressure Washing Services
Alteration
Post-Bid
Livermore, CA 94550

Pressure Washing for Hardscapes and Amenities
Alteration
Results
Anaheim, CA

Maintenance Services On Compressed Natural Gas(Cng)Fuel Stations in Riverside County
Alteration
Post-Bid
CA

Community Power Resiliency
Infrastructure
Results
Paradise, CA

Just-In-Time Irrigation Supply
Infrastructure
Post-Bid
Norco, CA 92860

HVAC and Refrigeration System Repairs
Alteration
Results
$200,000 est. value
CA

Reported 07/01/2022 12:00 AM
Project Title

Industrial Parts Washer Replacement

Physical Address View project details and contacts
City, State (County) Santa Cruz, CA   (Santa Cruz County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be done consists of removal, disposal, and replacement of up to three (3) industrial parts washers. One parts washer is to be replaced upon Notice to Proceed with the option to purchase up to two additional replacement parts washers. Contractor will be responsible for tying the new parts washer(s) into existing exhaust and fume systems and supply lines (water, electrical hard wiring, etc.). The Contractor will also be responsible for disposing of any replaced parts washers.

Details

Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents