Similar Projects
Construction of ADA Compliant Bus Shelter Pads TAP Project VI
Results
Espanola, NM 87532

SWMD Vehicle Maintenance Building Phase I Edith
Construction
Less than $24,150,000 est. value
Albuquerque, NM 87102

Construction of a New and/or Remodeled Administration Building
New Construction, Renovation, Addition - 9,000 SF
Results
$2,850,000 est. value
Nambe, NM 87506

Expansion of the Jim West Transit Center
Design
NM 87532

Multi-Modal Transportation Center EV Charging Stations
New Construction
Results
Raton, NM

Bus Shelters for Red Apple Transit
New Construction
Results
$152,000 est. value
Farmington, NM

APS Westside Bus Depot
New Construction - 26,764 SF
Construction
Albuquerque, NM 87121

Taos Transit Operations and Maintenance Facility
Renovation
Design
Taos, NM

APS Main Bus Depot
New Construction
Results
Albuquerque, NM

Western Command Vehicle Maintenance Facility
New Construction
Post-Bid
$10,000,000 to $19,000,000 est. value
Albuquerque, Kirtland, NM 87151

Western Command Vehicle Maintenance Facility
New Construction
Post-Bid
$10,000,000 to $19,000,000 est. value
Albuquerque, Kirtland, NM 87151

Vehicle Electric Charging Stations Equipment, Installation, and Parts
Infrastructure
Post-Bid
Albuquerque, NM

Reported 03/18/2022 12:00 AM
Project Title

Construction Services for Electric Vehicle Charging Station

Physical Address View project details and contacts
City, State (County) Truth or Consequences, NM   (Sierra County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide services as required to purchase and install two (2) fully functioning Level III (3) Electric Vehicle Charging Stations. Fully functioning is defined as the unit is purchased, installed, powered, permitted with the local permitting authority, able to be utilized for its intended purpose, and able to communicate with its respective dashboard interface. The parking pad, electrical infrastructure and associated infrastructure described in addendum #2 will still be required. The intent is for the City of T or C to have the ability to install two (2) additional level III car charging stations in the future as demand dictates. The infrastructure for the 2 future EV car charging stations shall mirror the infrastructure to be provided for the two (2) fully functional EV charging stations requested in this procurement.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents