Similar Projects
Wastewater Treatment Plant and Associated Appurtenances
Design
FL

Water Reclamation Facility Expansion
Addition
Design
Clermont, FL

Wastewater Treatment Plant No. 2 Expansion
Addition - 210,476 SF
Bidding
$15,000,000 to $18,000,000 est. value
Palm Coast, FL

Domestic Water Plant Maintenance Services
Renovation, Term Contract
Bidding
Sarasota, FL

Design Build Services Cosme WTP Operational and SCADA Improvements
Post-Bid
$30,000,000 est. value
Saint Petersburg, FL 33731

Mid-County Waste Water Treatment Plant Headworks
New Construction
Post-Bid
$5,000,000 est. value
Dunedin, FL 34698

Tindall Hammock Irrigation and Soil Conservation District Water Treatment Plant Improvements Phase 2
Term Contract
Results
Less than $572,000 est. value
Davie, FL 33314

HFC AWTP Master Plan Improvements, Phase I Design-Build
Results
Less than $254,000,000 est. value
Tampa, FL 33602

CR 136 / I-75 Water Treatment Plant
Construction
FL

Packing District Park - Master Lift Station Upgrades
Renovation
Construction
Orlando, FL 32869

Filters 1 and 2 Media Replacement at Water Treatment Plant 1
Renovation
Bidding
Daytona Beach, FL 32116

Bradenton Water Treatment Plant (WTP) Drying Lagoon
Post-Bid
Bradenton, FL 34203

Surface Aerator Assembly and Placement
Results
West Palm Beach, FL 33417

Consolidated Rivertown WTP Project Package
New Construction
Construction
Saint Johns, FL 32259

FiveAsh Water Treatment Plant Filters Rehabilitation - Phase 2
Renovation
Bidding
Fort Lauderdale, FL 33309

Last Updated 11/02/2021 08:28 AM
Project Title

Design Build Step 1 - Northeast Water Treatment Building Project

Physical Address View project details and contacts
City, State (County) Naples, FL 34116   (Collier County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $7,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design-build teams for the design and construction of a new Interim Water Treatment Building. The new Interim Water Treatment Building will be located on the County’s Northeast Service Area Utility Plant site located just east of the Big Corkscrew Island Regional Park on 39th Avenue NE in Naples, Florida.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents