Similar Projects
Future Western High School
New Construction
Conception
$157,707,000 est. value
VA

Franklin Middle School Renovations
Renovation
Conception
$71,411,764 est. value
Chantilly, VA 20151

Centreville High School - Fairfax County
Renovation - 410,000 SF
Design
$158,000,000 CJ est. value
Clifton, VA 20124

Haycock Row Mixed-Use Development
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Falls Church, VA 22042

Old Mount Vernon High School Theater Services
Demolition, New Construction, Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Alexandria, VA 22309

Sandburg Middle School Science Lab Project
Renovation
Post-Bid
$390,000 est. value
Alexandria, VA 22308

Original Mount Vernon High School
Renovation
Post-Bid
$81,000,000 CJ est. value
Alexandria, VA 22309

Renovation Project Falls Church High School
New Construction, Renovation, Demolition - 475,993 SF
Results
Less than $100,000,000 est. value
Falls Church, VA 22042

Gymnasium Divider Curtain Replacements
Renovation
Results
$74,600 CJ est. value
Fairfax, VA 22032

The Madeira School
New Construction - 36,540 SF
Construction
$10,000,000 CJ est. value
McLean, VA 22102

Frost Middle School Renovation Project
Renovation
Construction
Fairfax, VA 22032

Twain Middle School Renovations
Renovation
Conception
$70,106,633 est. value
Alexandria, VA 22310

Centreville High School - Fairfax County
Renovation - 410,000 SF
Design
$138,454,000 CJ est. value
Clifton, VA 20124

McLean High School Group Bathroom Upgrades
Renovation
Post-Bid
$100,000 CJ est. value
McLean, VA 22101

Folding Divider Wall Replacement at Mount Vernon High School
Renovation
Results
$128,877 CJ est. value
Alexandria, VA 22309

Last Updated 04/14/2023 02:40 PM
Project Title

Whitman Middle School Group Bathroom Upgrades

Physical Address View project details and contacts
City, State (County) Alexandria, VA 22306   (Fairfax County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $109,000 [brand] Estimate
Plans Available from Agency's Affiliate - 03/30/23
Owner View project details and contacts
Architect View project details and contacts
Description

Bidding documents will be available electronically to Prospective Bidders on Thursday, March 30, 2023, from FCPS Senior Buyer, Roger Wimmer, rlwimmer@fcps.edu, 571-423-2279 or Buyer Supervisor, Sharon Kropp, shkropp@fcps.edu, 571-423-2414. For additional questions, contact Roger Wimmer, senior buyer, at 571-423-2279 or via email at rlwimmer@fcps.edu.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents