Similar Projects
U-Haul - King Street / Charleston
New Construction, Renovation, Infrastructure - 171,392 SF
Conception
$12,000,000 CJ est. value
Charleston, SC 29403

Stono Shores Subdivision
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Charleston, SC 29412

Thompson Hotel - Montford Building
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Charleston, SC 29403

Thompson Hotel - Montford Building
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Charleston, SC 29403

FLETC Training Venue Replication
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
North Charleston, SC 29405

FLETC Training Venue Replication
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
North Charleston, SC 29405

Construction of Azalea Fuel Facility
New Construction, Infrastructure
Results
$13,906,000 CJ est. value
North Charleston, SC 29405

Roadwork - Ashley Hall Plantation Road Right Turn Lane
Infrastructure
Results
Charleston, SC 29407

Spinx #368 / Charleston
New Construction, Infrastructure - 4,000 SF
Construction
$3,000,000 CJ est. value
Charleston, SC 29401

The Hamlet at Maybank Highway / Johns Island
New Construction, Infrastructure
Construction
$30,000,000 CJ est. value
Johns Island, SC 29455

Cumberland Residential - The Clarke
Demolition, New Construction, Infrastructure - 3,000 SF
Pending Verification
$10,000,000 CJ est. value
Charleston, SC 29401

Cumberland Residential - The Clarke
Demolition, New Construction, Infrastructure - 3,000 SF
Pending Verification
$10,000,000 CJ est. value
Charleston, SC 29401

New District 20 Middle School - Charleston County School District
New Construction, Infrastructure
Conception
$22,000,000 CJ est. value
Charleston, SC 29403

Huger Street Hotel
New Construction, Infrastructure
Design
$37,000,000 CJ est. value
Charleston, SC 29403

Christian Brothers Automotive / Charleston
New Construction, Infrastructure - 5,343 SF
Post-Bid
$1,400,000 CJ est. value
Charleston, SC 29412

Last Updated 02/23/2023 08:18 AM
Project Title

St Andrews Fire Station #3

Physical Address View project details and contacts
City, State (County) Charleston, SC 29414   (Charleston County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Schematic Drawings, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $8,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the construction of a new fire station and associated improvements. As of February 2023, the project is in Design. Design/Build Contractor selected. No Schedule for Subbidding at this time. Construction start is undetermined.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents