New Jail Development - Sarpy County
New Construction, Infrastructure - 146,000 SF
Design
$68,500,000 CJ est. value
Papillion, NE 68046

The Bridge Flats
New Construction, Infrastructure - 18,000 SF
Design
$13,000,000 CJ est. value
Bellevue, NE 68005

SATCOM - MILSTAR Building OFFUT AFB
New Construction, Infrastructure
Bidding
$40,000,000 CJ est. value
Bellevue, NE 68123

SATCOM - MILSTAR Building OFFUT AFB
New Construction, Infrastructure
Bidding
$40,000,000 CJ est. value
Bellevue, NE 68123

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

SCCWWA Phase 1A - Lift Stations (LS), Force Mains (FM), & Zweibel Creek - 3 Interceptor (ZC-3)
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Springfield, NE 68059

Aspen Creek North - Phase 2 Water Main Improvements
Infrastructure
Results
Gretna, NE

US-6/Harrison ST
Infrastructure
Results
$5,000,000 est. value
NE

Stadium Team Meeting Room Building - Papillion LaVista Public Schools
New Construction, Infrastructure - 4,950 SF
Construction
$940,500 CJ est. value
Papillion, NE 68046

Nebraska Crossing
Addition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Gretna, NE 68028

Crisis Stabilization Center - Sarpy County
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Bellevue, NE 68005

RFP - Sewer Rate Study
Term Contract
Bidding
La Vista, NE 68128

Southern Sarpy County Regional Wastewater System - Phase 1A - LS & FM
New Construction, Infrastructure
Post-Bid
$40,000,000 CJ est. value
Springfield, NE 68059

Building V Water Main Relocation Nebraska Crossing Outlets
Infrastructure
Results
Gretna, NE

R&R Commerce Park South Additional Phases / Sarpy Industrial / Papillion
New Construction, Infrastructure - 862,000 SF
Pending Verification
$449,000,000 CJ est. value
Richland Viii, NE 68138

Last Updated 11/16/2022 10:34 PM
Project Title

Sanitary Sewer System Section I for Sanitary and Improvement District No. 369

Physical Address View project details and contacts
City, State (County) Springfield, NE 68059   (Sarpy County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,881,565 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing all labor, tools, materials and equipment required to construct as SANITARY SEWER SYSTEM SECTION I for Sanitary and Improvement District No. 369, Sarpy County, Nebraska The work consists essentially of the following estimated quantities: APPROXIMATE QUANTITIES 1 CONSTRUCT 8" SANITARY SEWER PIPE 16,142 LF 2 CONSTRUCT 8" SANITARY SEWER DUCTILE IRON PIPE 25 LF 3 CONSTRUCT 6" SANITARY SEWER PIPE 8,176 LF 4 CONSTRUCT 54" I.D. SANITARY MANHOLE (81) 1,003 VF 5 CONSTRUCT SANITARY SEWER MANHOLE TAP 2 EA 6 INSTALL EXTERNAL FRAME SEAL 81 EA 7 CONSTRUCT 8" SANITARY SEWER PLUG 2 EA 8 CONSTRUCT AGGREGATE BEDDING FOR TRENCH STABILIZATION 194 TN 9 INSTALL GEOTEXTILE FABRIC 728 SY 10 CONSTRUCT TYPE B RIP-RAP 291 TN 11 INSTALL BX1100 GEOGRID 631 SY 12 CONSTRUCT 8" EXTERNAL DROP CONNECTION 5 VF All proposals must be submitted on bid forms furnished by E & A Consulting Group, and must be accompanied by an original bid bond or a certified check in the amount not less than $105,400.00 made payable to the Treasurer of Sanitary and Improvement District No. 369 as security that the bidder to whom the contract may be awarded will enter into a contract to build the improvements in accordance with this Notice to Contractor and will give a contract and maintenance bond in the amount of 100% of the total contract price, all as provided in the specifications. Bid bonds must be executed by a duly licensed corporate surety. Checks accompanying proposals not accepted shall be returned to the bidders. No bidder may withdraw his proposal for a period of sixty (60) days after date set for opening of bids. All proposals must be enclosed in an envelope, sealed and addressed to the "Clerk of Sanitary and Improvement District No. 369" and shall be marked "PROPOSAL FOR SANITARY SEWER SYSTEM - SECTION I" with the bidder's name and address on said envelope. The Bid Security shall be in a separate sealed envelope attached to the Proposal envelope and shall be marked "BID SECURITY" with the project identified thereon. Proposals received after the above time shall be returned unopened to the bidder submitting the proposal. The work herein provided shall be done under written contract with the responsible bidder submitting the lowest acceptable bid in accordance with the requirements of the plans and specifications and as provided by law. Sanitary and Improvement District No. 369 of Sarpy County, Nebraska, reserves the right to reject any or all bids received and to waive informalities and irregularities.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents