Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Y--Station Service Replacement_Fl-Fg
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Dutch John, UT 84023

2022 CIPP Rehabilitation Project Prequalification
Infrastructure
Bidding

General Contractor and Electrical Contractor Timpanogos
Addition
Post-Bid
American Fork, UT

Provo River Trail Solar LED Lighting
Post-Bid
Provo, UT 84606

Duchesne MS4
Term Contract
Results
Duchesne, Orem, UT 84057

2021 Provo City Grandview 1200 North Storm Drain Project
Results
Provo, UT 84604

Multi-Site Backup Generator Installation
Post-Bid
Provo, UT 84604

Phase II Street Lighting Project
Results
$500,000 to $600,000 est. value
Orem, UT 84057

Tanner to Mountain Vista OPGW Installation
Post-Bid
Provo, UT

2021 Eagle Mountain City Concrete Collar Replacement
Term Contract
Results
$35,000 est. value
Eagle Mountain, UT

Keller Building LED 2021
Alteration
Post-Bid
Orem, UT

Electrical Services
Results

Contractor Pre-Qualification Packet - Reuse Project
Infrastructure
Post-Bid
Orem, UT 84058

2021 Utility Grade Adjustment Project
Results
$92,050 est. value
West Jordan, UT

Reported 02/16/2022 12:00 AM
Project Title

Pressurized Irrigation Metering Project - Phase 1

Physical Address View project details and contacts
City, State (County) American Fork, UT   (Utah County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installing an AMI Water Meter and Transponder on 3,400 of the existing American Fork City pressurized irrigation (PI) service lines in existing meter boxes. The AMI meter and transponder will be furnished by the OWNER. Work includes removing existing jumper pipe section, removing the hose bibb, installing the AMI meter and transponder, and repairing any leaks. Work to be performed includes all items necessary to install meters and transponders including, but not limited to, mobilization, traffic control, excavation, backfilling, surface restoration, and inspections.

Details

Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents