Similar Projects
Fountain Park Shelter Demolition Project
Demolition, Infrastructure - 1,000 SF
Design
$80,000 CJ est. value
Piqua, OH 45356

Crack Sealing
Infrastructure
Design
$121,818 CJ est. value
South Charleston, OH 45368

Miscellaneous - SR 149
Infrastructure
Sub-Bidding
$740,465 CJ est. value
Belmont, OH 43718

Administration Building Asbestos and Universal Wastes Removal Pre-Demolition
Infrastructure, Alteration
Post-Bid
Bowling Green, OH

TM 2021 Asbestos Removal
Alteration
Post-Bid
Oxford, OH

Lead Removal Abatement Project
Alteration
Results
$78,565 est. value
Lakewood, OH 44107

Abatement of Buildings
Alteration
Results
Elyria, OH 44035

Renovations for Magee Marsh Migratory Bird Center
Renovation
Construction
$2,962,862 CJ est. value
Oak Harbor, OH 43449

Industrial Park
New Construction, Infrastructure - 94,500 SF
Pending Verification
$13,500,000 CJ est. value
Dayton, OH 45414

Asbestos Removal on 1 Structure Per Survey Results
Term Contract, Infrastructure
Design
$40,000 CJ est. value
Wooster, OH 44691

Trash Abatement Services
Term Contract, Alteration
Post-Bid
Colerain, OH

Asbestos Abatement Project
Alteration
Results
Piqua, OH 45356

Nuisance Abatement Services
Term Contract
Post-Bid
OH

Asbestos Abatement Project
Alteration
Results
Piqua, OH 45356

DPU Deionized Water Exchange Service
Alteration
Post-Bid
$25,000 est. value
Columbus, OH

Last Updated 11/17/2022 08:40 AM
Project Title

Demolition and Disposal of Structures

Physical Address View project details and contacts
City, State (County) London, OH 43140   (Madison County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Construction start expected January 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 11/17/22 The City of London has made the decision to reject all proposals for the demolition of the two buildings located at 60 S. Walnut Street. A new request for bids will be posted on the City of London's website at https://www.londonohio.gov/notice-to-bid next week and in the Madison Messenger as soon as time allows. For demolition of buildings at 60 S. Walnut Street. The City of London, has the right to reject any and all bids. Building #1 (school and gymnasium) and Building #2 (utility garage) are to be demolished to grade and all materials hauled away at the expense of the Bidder, except as noted. The footprint of each building must also be excavated and removed from the site to a depth of twenty-four inches (24") below the lowest grade. All foundation walls and footings must be removed. All utilities shall be capped at the right-of-way.Proper fill must be used and be approved by the Safety Service Director prior to placement. See Bid Alternate #1 1. Building #1 is an abandoned school with an attached gymnasium, both structures have a basement he following details are to be considered in the demolition: a) All utilities have been turned off by the City of London. However, the gas line, water line, storm sewer connection, sanitary sewer connection, and any telephone wire, cable wire, and/or electric wire must be removed or capped. b) Building #1 has a basement and any footers and/or concrete slabs must be excavated and removed from the site to a depth of twenty-four inches (24") below the lowest grade. All foundation walls and footings must be removed.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents