Similar Projects
Onlogic Production Facility & Office Building
New Construction - 130,790 SF
Conception
South Burlington, VT 05403

Severance Park
New Construction - 21,530 SF
Design
Colchester, VT

Williston Road Family Dental
New Construction
Design
Williston, VT

Red Stone Cottage Renovations
Renovation - 4,110 SF
Post-Bid
$550,000 est. value
Burlington, VT 05401

Cottonwood Crossing - Phase I
New Construction - 35,670 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Williston, VT 05495

Fiddlehead Manufacturing Facility
Addition - 40,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Shelburne, VT 05482

UPS Customer Service Center Expansion
Addition
Pending Verification
Williston, VT 05495

Vermont Information Processing
New Construction
Pending Verification
Colchester, VT 05446

Mixed Use Commercial Building
New Construction - 7,600 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Williston, VT 05495

Market Street Development
New Construction
Construction
South Burlington, VT

Hinesburg Planned Development
New Construction
Pending Verification
South Burlington, VT 05403

Second Story Addition To Hanger/ Office South Facade
New Construction, Addition - 61,062 SF
Design
$5,000,000 to $10,000,000 CJ est. value
South Burlington, VT

Cottonwood Crossing Phase 2
New Construction - 37,850 SF
Construction
$7,500,000 est. value
Williston, VT 05402

St. Michael's College North Campus Development
New Construction - 28,000 SF
Design
Colchester, VT

Severance Corners Development
New Construction - 250,000 SF
Construction
$1,303,109 est. value
Colchester, VT 05446

Last Updated 03/31/2022 03:19 PM
Project Title

Shelburne Green South

Physical Address View project details and contacts
City, State (County) Shelburne, VT 05482   (Chittenden County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Office
Contracting Method
Project Status Construction Commenced October 2020, Construction Complete as of December 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $3,029,100
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

12 Office, Manufacturing/Processing Plant, 1 Story Above Grade, 70,600 SF New Construction, Renovation.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Wood Framing, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents