Similar Projects
Garfield/22nd Bridge Improvement - City Of Decatur
Infrastructure
Conception
$1,100,000 CJ est. value
Decatur, IL 62526

Decatur Raw Water Pipeline From Sludge Lagoon - City of Decatur
Infrastructure
Conception
$960,000 CJ est. value
Decatur, IL 62523

Millikin University Student-Athlete Facility
New Construction, Infrastructure, Renovation - 10,870 SF
Design
$6,700,000 CJ est. value
Decatur, IL 62522

Fermentation Reactor Pilot Project
Infrastructure
Bidding
$225,000 CJ est. value
Decatur, IL 62523

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Clarifier Conversion
Renovation
Results
$15,600,000 est. value
Decatur, IL 62521

Southeast Learning Center Demolition
Demolition
Results
Decatur, IL 62521

A-O Grade School Pavement Rehabilitation
Infrastructure
Construction
$333,852 CJ est. value
Oreana, IL 62554

HSHS St. Mary's Hospital Renovation
Addition, Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Decatur, IL 62521

South Water Treatment Plant(SWTP) - Additional Water Reservoir - City of Decatur
Renovation, Infrastructure
Conception
$3,850,000 CJ est. value
Decatur, IL 62521

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

2022 Valve and Hydrant Replacement
Infrastructure
Results
$480,988 est. value
Decatur, IL

Brush College Road Water Main Relocation - City of Decatur
Infrastructure
Conception
$750,000 CJ est. value
Decatur, IL 62526

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Post-Bid
Schaumburg, IL 60194

Last Updated 05/05/2023 08:06 AM
Project Title

2023 Miscellaneous Sanitary and Storm Sewer Imporvement Project

Physical Address View project details and contacts
City, State (County) Decatur, IL 62523   (Macon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This work shall consist of making point repairs in the Citys storm and sanitary sewer system at various locations around the City including the installation of new manholes as required. This project will perform a majority of the Citys rapid response storm and sanitary sewer system repairs through June 1, 2024, along with any additional storm and sanitary sewer repair work identified by the City. The work also includes pavement removal and restoration along with traffic control, and other items of restoration.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents