Similar Projects
Elkmont Well Rehabilitation
Alteration
Bidding
$690,000 to $695,000 est. value
Wilmington, NC

Skid Mounted Diesel Pump for Ellis Pump Station
Infrastructure
Bidding
Jacksonville, NC

Replace Pumps and Controls B3881
Post-Bid
$100,000 to $250,000 est. value
Cherry Point, NC 28533

Three Phase Pump for Commons P.S.
Post-Bid
Jacksonville, NC

Contract III - 2020 USDA Well Building Improvements
Results
Red Springs, NC 28377

Construction of 2 New Water Supply Wells Serving
Results
Less than $392,000 est. value
Wallace, NC 28466

Water Well Drill
Post-Bid
Willow Spring, NC 27592

16" PTO Pump-NCFS
Results
Raleigh, NC 27699

Vacuum Turbo Pump
Post-Bid
Raleigh, NC

Pendergrass Chlorine Booster Pump System
Results
Sanford, NC 27330

Tsurumi Pumps Submersible
Post-Bid
Wilmington, NC

Repair, Overhaul, and Rebuild of Stokes Mechanical Pump
Results
Cherry Point, NC

Annual Standby Emergency Pumping Contract
Term Contract
Post-Bid
Pine Knoll Shores, NC

Well 46 And 47 Improvements
Results
$1,192,000 to $1,196,000 est. value
Wilmington, NC

Hymax Grip Elbow
Term Contract
Post-Bid
Jacksonville, NC

Reported 02/09/2022 12:00 AM
Project Title

Well 25 Pump Replacement B4364

Physical Address View project details and contacts
City, State (County) Cherry Point, NC 28533   (Craven County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes providing a new pump in Well House 25 and incidental related work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents