Similar Projects
Flat Creek Drive South Waterline - Town Of Jackson
Alteration
Conception
$360,000 est. value
Jackson, WY 83001

Raw Water Line to Rawlins Cemetery From Golf Course - City of Rawlins
Infrastructure
Conception
$1,067,389 est. value
Rawlins, WY 82301

Plum Alley Waterline
Alteration
Design
$400,000 est. value
Pavillion, WY

Slip Line Sewer Lines for Quarters 22 and Quarters 17B
Infrastructure
Bidding
$25,000 to $100,000 est. value
Sheridan, WY 82801

Dutton Creek Road Cattle Guard Replacement Project
Infrastructure
Bidding
$350,000 est. value
Laramie, WY

2021 McCollister Drive Water Main Replacement
Alteration
Post-Bid
Jackson, WY 83001

Cottonwood Emergency Waterline Replacement
Infrastructure
Post-Bid
Edgerton, WY 82635

The Construction of 2021 Fall Street Patching Project
Infrastructure
Results
Jackson, WY 83002

Leavitt Reservoir Expansion Project
New Construction, Infrastructure
Results
$40,000,000 to $50,000,000 est. value
Greybull, WY

Scott A Mohror
Infrastructure
Bidding
$330,000 est. value
Jackson, WY

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Bar Nunn Asphalt Improvements - Phase II
Alteration
Results
$293,832 est. value
Bar Nunn, WY

GAOA Hunter Creek Roads
Infrastructure
Bidding
$100,000 to $250,000 est. value
Buffalo, WY 82834

WY NPS Yell 10(23), Grand Loop Road - Old Faithful To West Thumb
Term Contract
Post-Bid
Yellowstone National Park, WY

Completion of Raw Water Reservoir
Infrastructure
Results
Green River, WY

Last Updated 07/18/2022 01:46 AM
Project Title

2022 Saratoga Spring Avenue Utility and Street Improvement Project

Physical Address View project details and contacts
City, State (County) Saratoga, WY 82331   (Carbon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Saratoga Spring Avenue Utility and Street Improvement Project Lewis & Lewis, Inc. is requesting bids from subcontractors and suppliers on behalf of the Town of Saratoga for the above referenced project as required for Construction Manager at Risk (CMAR) projects pursuant to W.S.16-6-1001. Materials include C-900 water pipe, ductile iron valves, ductile iron fittings, fire hydrant assemblies, andwater service components. Subcontracted services include concrete, boring, dewatering, and pulverize/milling

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents