Similar Projects
Last Updated | 07/25/2022 12:02 PM |
Project Title | Paradise Irrigation District (PID) Reservoir B Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Paradise, CA 95969 (Butte County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $8,653,500 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This is a public works project consisting of work to repair and replace critical potable water and distribution system infrastructure that was damaged by the Camp Fire in 2018. The project is needed to sustain operations and provide water for the anticipated post-fire re-build population within the PID service boundary. This project will include two 1.5-million-gallon, bolted steel tanks to replace an earth embankment lined reservoir that was covered by a flexible membrane cover that was destroyed by the fire. In support of the installation of the two 1.5-million gallon tanks, the project also includes tree removal, grading, engineered fill, underground piping and valves, fencing, electrical, photovoltaic systems, etc. The Engineer's opinion of probable construction cost for this project is $7.5M. For further information regarding this project, contact Sami Kader at samik@wwengineers.com. |
||||||||||||||||
Details |
|
||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |