Similar Projects
Sawtooth Campground & Cabins
New Construction, Infrastructure
Conception
Hill City, SD

Shoulder Widening, Pipe Work, Spot Grading; Replace Str (RCBC), Approach Grading
Infrastructure
Conception
$23,015,000 est. value
Rapid City, SD

Sunburst Drive Reconstruction
Infrastructure
Design
Rapid City, SD 57702

Pavement Rehabilitation Project - Red Rock Canyon Road and Idlewild Court
Infrastructure
Design
Rapid City, SD 57702

Replace Asphalt and Drainage Camp Rapid B456 project
Infrastructure
Bidding
$2,000,000 est. value
Rapid City, SD 57702

Street Chip Seal-Prairie View
Post-Bid
Box Elder, SD

Tarmac Repair
Infrastructure
Post-Bid
Rapid City, SD 57703

Saint Patrick Street Reconstruction
Results
$955,000 est. value
Rapid City, SD 57701

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Grading, AC Surfacing, Replace Str Bridge
Infrastructure
Conception
$12,849,000 est. value
Hill City, SD 57745

Alley Improvements - McGregor Street to Elm Street
Infrastructure
Post-Bid
Hill City, SD 57745

Pavement Rehabilitation Project - Rand Road
Results
$340,000 est. value
Rapid City, SD 57702

Full Depth Reclamation, AC Surfacing, Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$8,494,000 est. value
SD

East Anamosa Street - Street and Storm Sewer Repair
Infrastructure
Post-Bid
Rapid City, SD 57703

2021 Street Improvements
Results
$750,000 est. value
Wall, SD

Reported 07/14/2022 09:07 AM
Project Title

Modify Intersections

Physical Address View project details and contacts
City, State (County) Hill City, SD 57745   (Pennington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $3,312,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Hill City, South Dakota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. US16 EBL & WBL - Fm E of Rockerville to S of Reptile Gardens Length 0.0 As of July 13, 2022, the project is in Conceptual status. Anticipated Construction year is 2025. SDDOT - Modify Intersections *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents