Similar Projects
Residential Sound Insulation Program
Post-Bid
Louisville, KY

Abatement of Rubberized Gym Flooring - Phase C
Alteration
Post-Bid
Frankfort, KY

Covington Central Riverfront (CCR) Demolition and Abatement
Demolition, Alteration
Results
Covington, KY 41011

Asbestos Abatement at Tates Creek High School - Phase 2
Alteration
Results
Lexington, KY 40517

Grease Trap And Septic Tank Services
Term Contract, Alteration
Post-Bid
Lexington, KY

Granular Activated Carbon - Custom Reactivation or Virgin
Term Contract
Results
Fort Thomas, KY 41075

Sale of Surplus Mulch
Term Contract
Post-Bid
Covington, KY

Asbestos Abatement at Boone County High School
Renovation, Alteration
Results
Florence, KY 41042

Marion C. Moore School Gym Floor Abatement
Renovation, Alteration - 7,000 SF
Post-Bid
Louisville, KY 40228

Wilmore Elevated Storage Tank Rehabilitation
Infrastructure, Alteration
Results
Wilmore, KY 40390

Refuse Collection
Alteration
Post-Bid
Crab Orchard, KY

City Facilities Dumpster Improvements
Renovation
Results
$107,000 est. value
Florence, KY

Track Hoe and Grapple Bucket Services
Term Contract, Alteration
Post-Bid
KY

Water Quality Infrastructure Maintenance Services
Alteration
Results
Louisville, KY

Waste Removal Services
Term Contract, Alteration
Post-Bid
KY

Last Updated 03/31/2023 12:06 PM
Project Title

Paul Volk Hall and Conference and Retreat Center Demolition

Physical Address View project details and contacts
City, State (County) Owensboro, KY 42301   (Daviess County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Construction Manager to Subcontract, Bids by Invitation
Project Status Sub-Bidding Closed, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: The Work consists of the complete demolition and disposal of two buildings, and includes site work: Paul Volk Hall and the Conference and Retreat Center at Maple Mount. Paul Volk Hall (PVH), is approximately 30,289 sq. ft, and the Retreat Center is approximately 51,506 sq. ft, plus basement wells, dormers, balconies, etc. Also included is 98% compacted fill in the areas where both the buildings are removed, site grading and seeding. There are many utilities connecting the various campus buildings that must be reconnected and restored into service prior to demolition. The Work includes, but is not limited to building demolition, site clearing, earthwork, hot-mix asphalt paving, lawns and grasses, cast-in-place concrete, metal fabrications, sheet metal flashing and trim, manufactured roof specialties, gypsum board assemblies, site clean-up, and the complete disposal of all debris off-site.

Details

4 Stories Above Grade, 51,506 SF.
Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents