Similar Projects
Earlington Heights Metrorail Station Mixed Use
New Construction - 15,000 SF
Conception
Miami, FL 33142

Our Lady of the Rosary School Expansion
New Construction - 20,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL 33176

Rides Installation and Operation at Zoo Miami
Post-Bid
Miami, FL 33177

Pawcrest Dog Park Entryway
Post-Bid
Pinecrest, FL 33156

Tree Island Park - Phase 1 Park Development
Results
Less than $4,465,700 est. value
Miami, FL 33194

Roby George Park Locker Room Improvements and Outdoor Picnic Tables and Benches for Mayor Roscoe Warren Park
Results
Homestead, FL 33030

Soleste Spring Gardens
New Construction
Construction
$36,000,000 est. value
Miami, FL

Five Park
New Construction
Construction
$345,000,000 est. value
Miami Beach, FL 33139

Naranja Lakes Apartments
New Construction - 244,466 SF
Conception
$10,000,000 CJ est. value
Leisure City, FL

Sgt.Delancy - Playground Renovation
Post-Bid
Less than $263,200 est. value
Miami, FL 33176

City Parks Poured-In-Place Playground Surfacing
Results
South Miami, FL

Lake Sana Development
New Construction
Conception
Miami, FL 33010

Modello Park - Playground Renovation
Post-Bid
Less than $268,100 est. value
Homestead, FL 33033

Baseball Field Maintenance at Palmer Park
Results
South Miami, FL 33143

Replacement of Playground Surfacing
Post-Bid
Less than $185,000 est. value
Doral, FL 33178

Reported 04/30/2020 12:00 AM
Project Title

Quail Roost Park-New Playground Expansion and Surface Conversion

Physical Address View project details and contacts
City, State (County) Miami, FL 33157   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $592,000
Plans Available from County Agency - 04/03/20
Owner View project details and contacts
Architect View project details and contacts
Description

New playground equipment, Poligon shelter, lightning system, pavers, concrete walkways, concrete foundations, CMU wall, concrete benches, concrete curbing, PIP Resilient Surface, Engineered Wood Fiber Surface (EWF), benches, bike rack, picnic tables, trash receptacles and perform site preparation, earthwork and earth mound as shown on plans and described herein. Also included is the planting of new trees, root barriers, sod, and plant materials as shown on construction documents. Demolition of the existing playground concrete curb, temporary accessible route ,Artificial Turf, excavation a minimum of 12” inches of the existing material under the Artificial Turf , properly disposed of the material, and provide and install 12” inches of EWF (Engineered Wood Fiber Surface) Restoration of all areas, including walkways and lawns, which are damaged during the construction process.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents