Similar Projects
Mixed-Use Building
New Construction, Build-Out
Conception
Fall River, MA

State Road & Reed Road Development
New Construction
Conception
Dartmouth, MA

Residences at River Edge
New Construction - 33,239 SF
Design
Less than $12,000,000 est. value
Fall River, MA 02720

Adams House Redevelopment
Renovation - 23,845 SF
Design
Fall River, MA

Bathroom Upgrades
Renovation
Post-Bid
Fall River, MA 02721

Bathroom Renovations at Sunset Hill 6-1, Heritage Heights 6-2 and Fall River Diaferio Village - General Bid
Renovation
Post-Bid
$475,000 est. value
Fall River, MA 02720

Elevator Modernizations at Cardinal Medeiros Tower - General Bid
Results
Less than $1,300,000 est. value
Fall River, MA 02720

Elevator Upgrades to Two Traction Elevators, New Bedford Hotel Apartments 667-3
Results
$676,000 est. value
New Bedford, MA 02740

Grinnell Street Triplex
Renovation, Addition - 6,758 SF
Construction
Less than $50,000 est. value
Fall River, MA

Brayton Avenue Triplex
Renovation, Addition
Construction
Less than $13,000 est. value
Fall River, MA

Winthrop Street Multi Family Development
New Construction
Pending Verification
Taunton, MA

Anderson Way Apartments
New Construction - 7,645 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Dartmouth, MA

Cross Road Apartments
New Construction
Conception
Dartmouth, MA

Dean Street Apartment
New Construction
Design
Taunton, MA

Bathroom Renovations at Sunset Hill 6-1, Heritage Heights 6-2 and Fall River Diaferio Village - Filed Sub-Bids
Renovation
Post-Bid
$475,000 est. value
Fall River, MA 02720

Last Updated 11/15/2021 10:20 AM
Project Title

Accessible Unit Upgrades, Eugene Murphy Village 667-2 - General Bids

Physical Address View project details and contacts
City, State (County) Somerset, MA 02726   (Bristol County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $463,294
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The Work under the Contract consists of: 1. The Project consists of: Interior deconstruction of two semi-accessible units (units J48 and P73) and construction of interior partitions, kitchens, bathrooms, door assemblies, window assemblies, electrical, plumbing and masonry reconstruction. Site-work includes the removal of concrete sidewalks and parking areas, re-grading around building and installation of new concrete accessible sidewalks, ramps and asphalt parking areas meeting accessibility requirements. 2. All Work either shown on the Drawings or included in the Specifications unless specifically indicated as not to be done. B. In addition, the Work under the Contract includes: 1. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 2. The restoration of any items damaged or destroyed by encroaching upon areas outside the Project Site. 3. Providing and restoring, where appropriate, all temporary facilities.

Details

Apartments/Condominiums, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents