Similar Projects
Turner Park Lift Station
New Construction
Bidding
Saltillo, MS

2020 Sewer System Improvements
New Construction, Infrastructure
Post-Bid
Quitman, MS

Comprehensive Sanitary Sewer Improvements Project - Contract No 3A - Pump Station Improvements Phase One
Renovation, Infrastructure
Results
Greenville, MS

2020 CDBG Sewer Improvement Project
Renovation, Infrastructure
Bidding
Woodville, MS

Lift Stations Modifications
Renovation
Post-Bid
MS

Industrial Sewer Improvement
New Construction
Results
$350,000 to $400,000 est. value
MS

Sewer System Pumps/Lift Stations (7) Replacement
Renovation
Bidding
Marks, MS

Pump Station No. 8 Rehabilitation Project
Renovation
Results
Pascagoula, MS

Kiln Delisle Road Water Extension Project - Booster Pump Station Package
New Construction
Results
$44,260 est. value
Kiln, MS

Tucker Road Regional Pump Station 6 SRF Improvements
Post-Bid
Pascagoula, MS

Heidelberg Sewer And Pump Station Improvements
Renovation
Results
Heidelberg, MS

Sewer System Improvements Contract C - Carter Avenue Lift Station Improvements
Renovation
Results
New Albany, MS 38652

Rehabilitation of Wastewater Pump Station 6
Renovation
Results
Richland, MS

2020 Sewer Rehabilitation
Renovation, Infrastructure
Results
$334,350 est. value
Stonewall, MS

Moss Hill Drive Pumping Station
New Construction
Post-Bid
New Albany, MS 38652

Reported 11/16/2021 12:00 AM
Project Title

Yazoo Backwater Pumping Plant

Physical Address View project details and contacts
City, State (County) Vicksburg, MS   (Warren County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $250,000,000 to $500,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

New levees will be constructed to tie-in the structure to the existing Yazoo Backwater levee. The line of protection will be from the existing Yazoo Backwater levee, along new levee, along the new floodwalls and pumping plant structure, along new levee, to terminate at the Yazoo Backwater levee. A levee bridge will be constructed along the centerline of the existing levee to maintain public access along the levee. The pumping plant will be access controlled by vehicle gates and chain link fencing. In addition to the pumping plant, a Petroleum, Oil, and Lubricants (POL) storage building will be constructed on site. This will be a concrete masonry unit building with a slab foundation. Additional construction features of the project include an earthen cofferdam, construction and operation of a dewatering system, and development of on-site borrow and disposal areas. Utilities will be run parallel to and approximately 80 feet southeast of the pump station access road. Utilities include electrical power, natural gas, and potable water.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents