Similar Projects
Eagle Way Sewer Replacement Project
Infrastructure
Bidding
$250,000 est. value
Hoffman Estates, IL

Eagle Way Sewer Replacement Project
Infrastructure
Bidding
$250,000 est. value
Hoffman Estates, IL

Construction Management Services Pavement Preservation and Rehabilitation Services at Various Locations
Post-Bid
Chicago, IL

Asphalt Paving & Related Materials & Services - 3 Year Contract
Renovation, Term Contract
Post-Bid
Chicago, IL 60638

(6.2-Mile) Cleaning and Sealing Longitudinal Cracks in the Existing Concrete Pavement
Results
Chicago, IL 60007

Winnemac Rebuild Illinois Bonds and Alley Reconstruction
Results
Less than $305,000 est. value
Chicago, IL

2021 Summer Paving
Post-Bid
Buffalo Grove, IL

Rebuild Illinois Bonds And Alley Reconstruction
Renovation
Results
Less than $333,161 est. value
Harwood Heights, IL 60656

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

Resurfacing, Curb and Gutter Replacement, Sidewalk Replacement, Pavement Widening to Accommodate Bike Lanes
Results
Lemont, IL

2021 Pietrini School Traffic Flow Alteration
Post-Bid
Franklin Park, IL 60131

Traffic Signal Replacement and Sidewalk Construction on US 20 from Walnut Avenue to Center Avenue in Streamwood
Results
Streamwood, IL 60107

Reconstruction of Sixteen Existing Local Roads With Full-Depth Asphalt and Will Include Removals, Earthwork
Post-Bid
Arlington Heights, IL

Resurfacing Kenilworth Avenue from Green Bay Road to Sheridan Road in the Village of Kenilworth
Results
Kenilworth, IL 60043

Bituminous Patching Mixture
Post-Bid
Elgin, IL

Last Updated 05/04/2022 06:03 AM
Project Title

2022 Pavement Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Flossmoor, IL   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $580,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of HMA surface removal, pavement patching, sidewalk, driveway, and curb and gutter removal and replacement, structure adjustments, HMA surface course and polymerized level binder installation, parkway restoration, and all collateral work

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents