Similar Projects
Peninsula Bay - Master Plan
New Construction
Design
Cortez, FL 34210

North Point Development
New Construction, Build-Out - 36,538 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Stuart, FL 34994

Aluminum Dock
Bidding
Lake Alfred, FL

Tribute by Marriott
New Construction
Post-Bid
$12,000,000 est. value
Saint Augustine, FL 32080

M&R Waterfront Yankeetown, Yankeetown, Fl
Post-Bid
$25,000 to $100,000 est. value
Yankeetown, FL 34498

Design-Build Construction Delivery Method for New Fire Stations
New Construction - 17,250 SF
Results
Jacksonville, FL

Maurice Gibb Floating Docks
Results
Less than $600,000 est. value
Miami, Miami Beach, FL 33139

The Harbour in Historic Coconut Grove
New Construction, Renovation - 112,200 SF
Construction
$17,900,000 est. value
Coconut Grove, FL

North Cargo Berth 8 Extension
Construction
Less than $8,000,000 est. value
Cape Canaveral, FL 32920

M&R Waterfront St Pete, St Petersburg, FL
Post-Bid
$25,000 to $100,000 est. value
Saint Petersburg, FL

Dune Walkover 35S and 40 Rebuild
Results
Fernandina Beach, FL

Repair Waterfront at U.S. Coast Guard Station Cortez, FL
Post-Bid
$1,000,000 to $5,000,000 est. value
Cortez, FL 34215

Sweeting Park Dock Replacement (P12278)
Results
Less than $65,000 est. value
Fort Lauderdale, FL 33311

Repair WEG Docks
Post-Bid
$1,000,000 to $5,000,000 est. value
Panama City, FL 32403

Emeralda Marsh Observation Platform - Emeralda Marsh Conservation Area 3
Results
Less than $34,900 est. value
Palatka, FL

Last Updated 11/28/2018 09:39 AM
Project Title

Devil's Millhopper Geological State Park - Sinkhole Access Repair

Physical Address View project details and contacts
City, State (County) Gainesville, FL   (Alachua County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Base Bid: Contractor shall provide all labor, materials, equipment, supervision and permitting to remove the existing boardwalk, and to construct new boardwalk with pressure treated decking per the contract documents. Alternate #1: Contractor shall provide all labor, materials, equipment, supervision and permitting to remove the existing retaining wall, and to construct new retaining wall per the contract documents. Price is additive and shall reflect the cost for materials and installation of the retaining wall portion of the project, only. Alternate #2: Contractor shall provide all labor, materials, equipment, supervision and permitting to construct new boardwalk with composite decking (TREX or approved equal) per the contract documents. Price is to reflect the cost difference (additive or deductive) for materials and installation of composite decking instead of pressure treated decking only. Alternate #3: Contractor shall provide all labor, materials, equipment, supervision and permitting to remove and replace the fence from the start of the access stairway, connect to the new retaining wall, and from the new retaining wall to the existing 17" tree, instead of connecting to the existing wood 3 rail fence, as shown on sheets S113 to S117. Price is additive and shall reflect the cost for materials and installation of the fence portion of the project, only. Installation Floater Insurance is required for this project and must be included in bid price.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Shoreline Protection, Waterway Construction and Equipment, Marine Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents