Project Status | Bidding, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Minnesota St. Louis Park City Council has approved a conditional use permit (CUP) for the construction of a data center at 6400 Walker Street during a meeting on September 5. St Louis Park school district data center – ParkTV St. Louis Park The project will see a data center built to the southeast of a football field and next to an existing maintenance building. From the floor plans provided with the application, the data center will cover around 5,850 sq ft (543 sqm) of floor space and will feature office space, storage rooms, a dedicated repairs section, and a mechanical/electrical room. The project is expected to start in the fall or early winter, 2023, and to take 16 months to complete. The City Council received a report from Jacqueline Kramer, associate planner with the city of St. Louis Park, on the proposed data center. According to Kramer, the land suggested for the data center is currently an outdoor storage yard, mostly for gravel. Once constructed and operational, the data center will have approximately 12 members of staff, half of which will be off-site at any given time. Other site changes will include a new underground stormwater treatment system, new plantings and landscaping, and a new playground to the northeast of the building. At the end of Kramer's report, the request was approved unanimously by council members. In May 2023, a Pennsylvania high school received a $2.6m overhaul including a new data center for the district. In August of the same year, North Carolina's Brunswick County approved two containerized data centers for schools in the county, provided by Schneider Electric. The project consists of construction of a new two-story district data center adjacent to the existing maintenance building. The scope includes partial renovation of the maintenance building, consisting of upgrades to mechanical, plumbing, and electrical systems, tuckpointing and repairs of exterior masonry veneer, and replacement of most exterior doors. Sitework includes landscaping, irrigation system, concrete curb and sidewalks, and bituminous pavement. |
||||||||||||||||||||||||||||||||||||||
Details | ,, 25,443 SF - 11,386 SF. 2 Stories Above Grade, Site Work, Site Work. 14,057 SF.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |