Similar Projects
Fire Station 6 Replacement - City of Murfreesboro
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Murfreesboro, TN 37129

Sulphur Springs Road - Phase 3 - City of Murfreesboro
Infrastructure
Conception
$4,530,000 CJ est. value
Murfreesboro, TN 37129

MTRO Essential Maintenance
Renovation, Infrastructure
Design
$3,400,000 CJ est. value
Nashville, TN 37214

Bottled Blonde / Nashville
New Construction, Infrastructure - 25,000 SF
Design
$20,000,000 CJ est. value
Nashville, TN 37201

Upper Chaney Woods Interceptor Sewer (Segments 4 and 3)
Infrastructure
Bidding
$3,000,000 CJ est. value
La Vergne, TN 37086

Bridge Replacement Factory Creek Lane Over Factory Creek
Demolition, New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Waynesboro, TN 38485

Complete Site Prep 1st Fl. Bldg. 1A SPECT-CT
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Memphis, TN 38104

Corrugated Metal Drain Tile
Term Contract, Infrastructure
Post-Bid
TN

Gallatin Training Facility Mass Grading
Results
Gallatin, TN 37066

Demolition of Aircraft Hangar
Demolition
Results
Knoxville, TN 37920

Bledsoe Fall Creek Falls Fiber Optic Expansion
Renovation
Construction
Pikeville, TN 37367

The Chartwell at Marathon
New Construction, Infrastructure - 4,000 SF
Construction
$105,000,000 CJ est. value
Nashville, TN 37203

Whataburger - TN 109 / Lebanon
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Lebanon, TN 37090

Batts Lane Townhomes
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Clarksville, TN 37040

Sulphur Springs Road - Phase 1 - City of Murfreesboro
Infrastructure
Conception
$600,000 CJ est. value
Murfreesboro, TN 37129

Last Updated 09/14/2022 08:38 AM
Project Title

Water Storage Tank Improvements

Physical Address View project details and contacts
City, State (County) McMinnville, TN 37110   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

22159 No bidder may withdraw his bid within 60 days after the actual date of opening thereof. This project shall consist of furnishing of all material, equipment, machinery, labor, etc., necessary for the construction of the facilities more particularly described below and shown on the Plans. Work shall include all necessary items of construction and equipment within the limits shown on the Plans in order to provide finished installations complete in every respects. Any incidental operations, accessories, tests, etc., which are, in the opinion of the ENGINEER, necessary to complete the installation and place it in operation shall be provided regardless of whether or not they are specifically mentioned herein. No extra payment will be made except as provided for under adjustment items in the Bid Form or as extra work items authorized by the ENGINEERS in writing. Unless noted otherwise on the Drawings, the work to be performed under the contract shall consist of furnishing all materials and erecting complete, including foundation, painting and other related items, ground level water reservoirs of size and characteristics as described on the Drawings. Piping included in this Contract shall be as shown on the Drawings This specification covers repairs and improvements of the following water storage tank(s), all in accordance with the inspection reports provided: 1) Cardwell Mtn Water Storage Tank (2.0 mg) 2) Cope Mtn Water Storage Tank (2.0 mg) 3) Short Mtn Water Storage Tank (0.5 mg) 4) Harrison Ferry Mtn Water Storage Tank (0.5 mg) 5) Clearwell x 2 (0.25 mg each) 6) High Service Wet Well (30,000 gallon) 7) Blues Hill Water Storage Tank (0.1 mg)

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents