Similar Projects
Stor-It Right Storage Facility / Pabst Farms Commerce Center
New Construction, Infrastructure - 122,000 SF
Design
$13,000,000 CJ est. value
Oconomowoc, WI 53066

Maple Centre - Phase 2
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Mukwonago, WI 53149

STH 16; 5800' West of STH 83 To STH 190
Infrastructure
Bidding
$3,000,000 CJ est. value
Nashotah, WI 53058

STH 16; 5800' West of STH 83 To STH 190
Infrastructure
Bidding
$3,000,000 CJ est. value
Nashotah, WI 53058

Bike Path
Term Contract
Post-Bid
Brookfield, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Local Road Maintenance
Results
WI

ABB Inc. Headquarters
New Construction, Infrastructure - 301,320 SF
Construction
$161,000,000 CJ est. value
New Berlin, WI 53146

ABB Inc. Headquarters
New Construction, Infrastructure - 301,320 SF
Construction
$161,000,000 CJ est. value
New Berlin, WI 53146

National Heritage Academies / Waukesha
New Construction, Infrastructure - 45,000 SF
Pending Verification
$9,500,000 CJ est. value
Waukesha, WI 53189

Atlas Metals Parts Co Expansion
Addition, New Construction, Infrastructure - 4,900 SF
Pending Verification
$260,000 CJ est. value
Waukesha, WI 53186

Maple Centre - Phase 1
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Mukwonago, WI 53149

2023 Road Program: Utility Repairs And Roadway Resurfacing Professional Services
Infrastructure
Post-Bid
Sussex, WI

2021 Crackfill
Results
$100,000 est. value
Merton, WI 53056

Last Updated 01/03/2023 05:03 PM
Project Title

South Side Pump Station Consolidation

Physical Address View project details and contacts
City, State (County) Waukesha, WI 53186   (Waukesha County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $13,764,754 [brand] Estimate
Plans Available from Agency's Affiliate - 10/21/22
Owner View project details and contacts
Architect View project details and contacts
Description

A list of all subcontractors must be submitted and approved by the Director of Public Works one (1) calendar day prior to the Board of Public Works meeting scheduled to be held December 8, 2022 New Pump Stations at Fox Point & West Ave w/ new building w/ generator, piping, valves, electrical, and I&C Heyer Pump Station upgrades - new pumps, piping, controls, valves, HVAC, minor exterior changes, new generator Milky Way Pump Station upgrades - new backup generator and minor site plan changes Abandonment and Decommissioning of Burr Oak, Fox Point, Sunset Dr, and West Ave Pump Stations 5,600 Lin. Ft. 8-inch Through 18-inch Sanitary Sewer Open Cut Construction 180 Lin. Ft. Horizontal Directional Drill 8-Inch Pipe 400 Vert. Ft. Sanitary Manholes Concrete and asphalt pavement restoration Topsoil, sod, seed, and wetland restoration. Pre-Qualification: Yes Project Final Completion September 27, 2024 Liquidated Damages per Day: $500.00

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents