Similar Projects
Pump Rehab Lift Station 1 and 2
Infrastructure
Bidding
Del Valle, TX 78617

Sanitary Sewer Lift Station and Force Main to Serve the Samara Development
Infrastructure
Bidding
League City, TX

Lakeside Estates Lift Station Abandonment
Post-Bid
Hutto, TX 78634

Travis Ranch 3F Lift Station Improvements
Post-Bid
Heath, TX 75087

Custer Road Pump Station Meter Vault Relocation
Results
$3,454,363 est. value
Prosper, TX 75078

Newport Pointe Lift Station Phase 1
Results
TX

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

Heath Street Pump Station Improvements
Construction
$2,777,000 est. value
Rockwall, TX

Collier`s Ferry Pump Station
Renovation
Bidding
$25,282,100 est. value
Beaumont, TX

Grigsby Lift Station Rehabilitation Project
Post-Bid
Port Neches, TX 77651

Rodeo Arena Lift Station Improvements
Results
$364,128 est. value
Lindale, TX 75771

EST#2 New Ground Storage Tank and Pump Station
Infrastructure
Bidding
Morgan's Point Resort, TX

CDBG Lift Station Rehabilitation
Post-Bid
Poteet, TX 78065

Lift Station Control Panel Replacement Project
Results
Sugar Land, TX 77487

Pump Station Improvements
Renovation
Bidding
$85,000 est. value
Rising Star, TX

Last Updated 03/02/2022 11:48 AM
Project Title

Oak Street Lift Station and Force Main Phase IV

Physical Address View project details and contacts
City, State (County) Flower Mound, TX   (Denton County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the lift station improvements to include the replacement of the two small 77 HP pumps, relocation of existing pumps, the upsize of the mechanical piping and valving to 20” diameter, structural upgrades to the vault, vault modifications, replacement of the existing monorail hoist, the installation of a new 750 kW generator, site piping modifications, site grading, and electrical and instrumentation improvements.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 07 - Thermal and Moisture Protection.
Division 22 - Plumbing.
Division 26 - Electrical.
Division 31 - Earthwork.
Division 33 - Utilities, Common Work Results for Utilities, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents