Similar Projects
Belk Theatre Catwalks and Theatrical Lighting Renovations
Renovation
Results
Asheville, NC

Electrical, Plumbing and HVAC
Post-Bid
Asheville, NC

Replace Electrical Panels
Results
Asheville, NC

H--FY19 Annual Generator PM Service
Post-Bid
Asheville, NC 28805

MISC LED Exterior and Interior Lighting
Results
Asheville, NC

Buncombe Solar
Bidding
Asheville, NC 28801

LED Lamps for The AB-Tech Campus
Results
Asheville, NC

Highbay LED Retrofit Project
Results
Asheville, NC

MSD Mull Building IT Backup Generator
Results
Asheville, NC 28804

ART Charging Stations
Post-Bid
Asheville, NC

DODEA Americas UPS Upgrade and Warranty Services
Post-Bid

LED Lamp Retrofit for The AB-Tech Campus
Results
Asheville, NC

Furnish, Deliver and Install Theatrical Lighting System
Results
Flat Rock, NC 28791

Asheville ART Transit - PV System
Post-Bid
Asheville, NC

Z--Relocate Existing Access Control and Airphone Equipment for ER Entry
Post-Bid
Less than $25,000 est. value
Asheville, NC 28805

Last Updated 06/13/2019 10:02 AM
Project Title

BCS LED Initiative System Wide

Physical Address View project details and contacts
City, State (County) Asheville, NC   (Buncombe County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Install BCS provided LED high-bay Energy Solutions International (ESI) retrofit kits (T5-»LED) or line voltage LEDlescent lamps (T8->LED) replacing existing fluorescent T5 and T8 fixture components in BCS facilities. Installation: A. Installation for elementary, middle, and intermediate schools will be performed after normal working hours of building employees (3pm or thereafter). Installation for high schools will be performed in the spring and summer of 2019 during regular daytime hours unless otherwise noted (exception will be mid-March through mid-June). B. Provide detailed mounting instructions with kits and new fixtures C. Install kits level, plumb, and square with existing fixtures unless otherwise indicated. Repair, re-tether, or add tethers to fixtures as needed to ensure the prior requirements D. Install kits in each luminaire requiring kit and install new fixture to replace existing fixtures where indicated. E. Install new fixtures per manufacturers instruction, NEC 410.36 G. Where occupancy sensors are currently in place, replace and repair as needed H. Clean all areas of installation daily such that space can be used for intended purpose the next day I. Contractor will be responsible for disposing of all unused material, packing cartons etc., and will not use BCS trash or recycle dumpsters.
Details
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents