Similar Projects
22 Acre City Park
New Construction
Bidding
$1,000,000 to $2,000,000 est. value
Sugar Hill, GA

Repair and Replacement of Playground Parts on an Annual Contract
Renovation, Term Contract
Post-Bid
GA

Maintenance, Repair, and Resurfacing of Outdoor Sports Courts
Renovation, Term Contract
Post-Bid
Buford, Lawrenceville, Lilburn, Loganville, Norcross, Sugar Hill, Suwanee, GA 30046

Peachtree Ridge Park Baseball Field and Playground Renovations
Results
Lawrenceville, GA 30046

Tribble Mill Park Improvements
Results
Less than $3,000,000 est. value
Lawrenceville, GA 30046

Gwinnett Place Redevelopment Greenspace and Community Improvements
New Construction, Renovation
Pending Verification
Duluth, GA 30096

Construction and Repair of Trails on an Annual Contract
Alteration
Post-Bid
GA

Cemetery Field Synthetic Turf Replacement And Improvements
Results
Lawrenceville, Norcross, GA 30042

Rogers Bridge Park Trailhead - Phase 1
New Construction
Post-Bid
Duluth, GA 30096

Gateway Park Project
Results
Less than $215,000 est. value
Lawrenceville, GA 30045

Gold Mine Park Construction
New Construction
Results
Sugar Hill, GA 30518

GGC Tennis Court Resurfacing
New Construction, Infrastructure
Results
Lawrenceville, GA 30043

Destination Park Improvements
New Construction, Infrastructure
Results
Loganville, GA 30052

Multi-Purpose Trail Phase 2
New Construction
Results
Snellville, GA

Taylor Park Playground Replacement
Alteration
Results
Duluth, GA 30096

Last Updated 01/10/2022 10:57 AM
Project Title

Paver Lot and Taylor Park Redevelopment

Physical Address View project details and contacts
City, State (County) Duluth, GA 30096   (Gwinnett County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: The project generally consists of the demolition of an existing parking lot, construction of new public space amenities, construction of a pad ready space for a future building, sidewalks, utility connections, stormwater management features, and other items as shown it the plans and specifications. The “Taylor Park” portion of the project generally consists of grading for a future play area, installation of new sidewalks, and installation of new picnic areas. The Project requires coordination with the adjacent development of the future building which will be underway immediately upon successful completion of pad grading. Contractors are expected to work together for seamless project delivery.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents