Similar Projects
Well No. 5 Rehabilitation and Generator and Well No. 7 Generator
Infrastructure
Bidding
$550,000 est. value
Phenix City, AL

Construction of Side Stream Storage for Fairhope Sewer Upgrade Phase I
Renovation, Alteration
Bidding
$800,000 est. value
Fairhope, AL

Well 39A Construction
Post-Bid
Montgomery, AL

Construction of the Drinking Water Test Well 8
Post-Bid
Dauphin Island, AL

2019 Water System Improvements - Contract B New Water Supply Well No. 3, Existing Well No. 2 Pump Rehabilitation
Results
Buhl, AL 35446

CR40 Tank and Booster Pump CE Project
Results
$292,450 est. value
AL

Pintlala Water System
Alteration
Construction
Hope Hull, AL

Abandonment of Inactive Water Production Well Nos. S-7,1 and 3
Infrastructure
Bidding
$200,000 est. value
Dothan, AL

Heat Pumps
Infrastructure
Post-Bid
Winfield, AL

Purchase Four (4) Submersible Pumps
Results
Mobile, AL

Mountain Fork Water Treatment Plant High Service Pump Improvements
Infrastructure
Bidding
$400,000 est. value
New Market, AL 35761

Replace Water Supply Well - 1 (Contract C)
Infrastructure
Post-Bid
Axis, AL

Well Test Drilling - DWSRF
Results
Cordova, AL

Secondary Loop Pump Replacement Children's and Women's Hospital
Infrastructure
Post-Bid
Mobile, AL 36604

Well 2, Well 3, Well 4, BPS A and BPS B Upgrades
Results
Less than $2,000,000 est. value
Eufaula, AL

Last Updated 07/12/2022 01:33 AM
Project Title

Water Supply Test Wells

Physical Address View project details and contacts
City, State (County) Clanton, AL   (Chilton County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $270,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Forfurnishing all labor and materials and performing all work forthe Water Supply Test Wellsproject. This project includes the installation of an 8-inch 400 VLF testwell in a rock formation.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents