Similar Projects
Fordham Landing - Master Plan
New Construction - 1,530,000 SF
Conception
$3,500,000,000 est. value
University Heights, NY

Upgrade Dietz Stadium
Renovation
Design
$18,700,000 est. value
Kingston, NY 12401

Downtown Watertown YMCA
New Construction, Renovation, Addition - 79,369 SF
Design
$18,000,000 est. value
Watertown, NY 13601

Gutchess Lumber Sports Complex Phase 2 Contract 1G - General Construction
New Construction
Bidding
$500,000 est. value
Cortland, NY 13045

Replace Roof, Gym, Building 55
Renovation, Alteration
Bidding
$500,000 to $1,000,000 est. value
Ossining, NY 10562

Niagara Falls State Park - Tower Portable Snackstop
Renovation
Sub-Bidding
$100,000 est. value
Niagara Falls, NY 14303

Athletic Field Alterations
Post-Bid
Brockport, NY

Ensley Facility Overhead Door Relocation
Renovation
Post-Bid
Syracuse, NY 13210

Elmira High School Stadium Renovations
Renovation
Results
Elmira, NY

Doubleday Field Improvements - Contract 2
New Construction - 3,700 SF
Results
Cooperstown, NY 13326

12th Rock Ministries Indoor Sports Complex
New Construction - 104,000 SF
Construction
$12,000,000 to $15,000,000 est. value
Middletown, NY 10940

Impact Athletic Center
New Construction - 72,885 SF
Construction
$8,000,000 est. value
NY

X-Golf at Samanea New York Mall
Build-Out - 6,300 SF
Pending Verification
Westbury, NY 11590

81 Seaview Boulevard Skating Rink
Renovation
Pending Verification
Port Washington, NY 11050

New Buffalo Bills Stadium
New Construction - 1,413,802 SF
Design
$1,354,000,000 est. value
Orchard Park, NY 14127

Last Updated 06/17/2022 01:52 PM
Project Title

Dutchess Stadium Improvements

Physical Address View project details and contacts
City, State (County) Fishkill, NY 12524   (Dutchess County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility, Stadium
Contracting Method Competitive Bids.
Project Status Construction Documents, Bidding Expected November 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Athletic Facility, Addition.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Painting, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earth Moving, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents