Similar Projects
Houston Ship Channel House Tract Seepage Repairs
Design
$10,000,000 est. value
Houston, TX

Water, Sanitary Sewer and Drainage Facilities with Alternate Paving and Appurtenances to Serve North Diamondhead Boulevard Phase 1 and Newport Pointe Section 1
Bidding
TX

Construction of Proposed Water, Non-Potable Water line, Drainage and Paving Improvements on Shimmering Fields Section 1
Bidding
TX

Repair and Rehabilitation Services for Levee Rehabilitation Downstream of Siphon 21
Post-Bid
Less than $333,340 est. value
Highlands, TX

Vince and Little Vince Bayou Harvey Repairs, Harris County, Texas
Post-Bid
$250,000 to $500,000 est. value
TX

Flood Control Systems Equipment for Harris County
Results
TX

Construction of River Ranch Detention Pond A, B, and C
Results
Houston, TX

Lakeshore Way Drainage Improvements
Bidding
TX

Sims Bayou Harvey Repairs, Harris County, Texas
Post-Bid
TX

HPW FY 2020 Drainage Rehabilitation (Swat) Work Orders 1
Results
Less than $4,000,000 est. value
Houston, TX

Construction of Westwood Subdivision Maple Leaf Box Culverts and Magnolia Creek Ditch Extension
Post-Bid
Houston, TX

HPW FY 2020 Local Drainage Program (LDO) Contract 2
Results
Less than $3,000,000 est. value
Houston, TX

Houston Ship Channel Placement Area 15 Improvements
Post-Bid
$5,000,000 to $10,000,000 est. value
Houston, TX 77002

FY2020 Local Drainage Program (LDP) Contract 3
Results
$2,500,000 est. value
Houston, TX 77000

Lake Houston Pump Station Screen Channel Rehabilitation
Post-Bid
Crosby, TX 77532

Last Updated 05/08/2020 08:52 AM
Project Title

Elyson Phase III Mitigation Basin 3

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Project: 1. Site Preparation, Mitigation Basin Excavation, on-site spoil disposal, drainage swales, and weir structure 2. Approx. 310,820 Cubic yard of Mitigation Basin Excavation, and Spoil Disposal 3. Approx. 1,400 LF of Concrete Pilot Channel4. Approx. 4,130 LF of Drainage Swale 5. Approx. 4940 LF of Backslope Interceptor Swale, and 14 Backslope Interceptor Structures 6. Approx. 110 LF of 30-inch CGMP outfall 7. Approx. 680 SY of 5-inch Thick Slope Concrete Paving 8. Approx. 430 SY of 18-inch and 24-inch Thick Rip Rap 9. Stormwater Pollution Control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents