Similar Projects
Last Updated | 05/08/2020 08:52 AM |
Project Title | Elyson Phase III Mitigation Basin 3 |
Physical Address | View project details and contacts |
City, State (County) | TX (Harris County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Project: 1. Site Preparation, Mitigation Basin Excavation, on-site spoil disposal, drainage swales, and weir structure 2. Approx. 310,820 Cubic yard of Mitigation Basin Excavation, and Spoil Disposal 3. Approx. 1,400 LF of Concrete Pilot Channel4. Approx. 4,130 LF of Drainage Swale 5. Approx. 4940 LF of Backslope Interceptor Swale, and 14 Backslope Interceptor Structures 6. Approx. 110 LF of 30-inch CGMP outfall 7. Approx. 680 SY of 5-inch Thick Slope Concrete Paving 8. Approx. 430 SY of 18-inch and 24-inch Thick Rip Rap 9. Stormwater Pollution Control. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |