Similar Projects
Playground Equipment for Cherry Hill and Ford Woods
Bidding
Dearborn, MI 48124

Kennedy Park Expansion
Addition
Bidding
Detroit, MI

Turf Field Construction and Track Reconstruction
Post-Bid
New Boston, MI

Design and Build Aquatic Play Area
Post-Bid
Southgate, MI 48195

Bird Elementary School Paving Expansion and P-CEP JV Track and Field Replacement Project
Results
Plymouth, MI

Palmer Park Multi-Sports Hub
Term Contract
Results
Detroit, MI

Park Promenade Development
New Construction - 165,000 SF
Construction
$10,000,000 CJ est. value
Woodhaven, MI 48183

Early Childhood Education Center
New Construction - 58,000 SF
Construction
$15,000,000 est. value
Detroit, MI

French Landing Park Improvements
Bidding
Belleville, MI 48111

City of Melvindale Playground Design and Build Out
Post-Bid
Melvindale, MI 48122

Laker Park Renovations
Term Contract
Results
Detroit, MI 48226

Playground Equipment Relocations
Post-Bid
Westland, MI 48185

Rouge Park Renovations (Brennan Splash Padl)
Term Contract
Results
Detroit, MI

Park Drinking Fountains
Post-Bid
Taylor, MI

Pingree Park Improvements
Term Contract
Results
Detroit, MI

Last Updated 04/09/2020 11:10 AM
Project Title

Practice Football Field Improvements

Physical Address View project details and contacts
City, State (County) Dearborn, MI   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Field Engineering and Surveying; including, but not limited to layout and cut and fill staking 2. Soil Erosion Control and Sedimentation Control Measures 3. Sod Stripping and Topsoil Removal, Stockpiling, Placement and Shaping 4. Manhole Adjustment 5. Earthwork and Excavation; including legal exportation of unused soils 6. Stone Drainage Trench 7. Imported and Placement of Sandy Loam Topsoil 8. Imported and Placement of Athletic Field Mix 9. Automatic Irrigation System (include all plumbing connections and permitting, winterization and start up) 10. Fine Grade and Sodded Lawn (see alternate section) 11. One Year Warranty and Guarantee Period

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents