Similar Projects
Rhyne Terraces
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Gastonia, NC 28052

Sewer Expansion - Southern I-85 Area - Davidson County
Infrastructure
Conception
$38,423,583 CJ est. value
Bessemer City, NC 28016

Kendrick Townhomes
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Gastonia, NC 28052

Old Hickory Grove Road Water Main Improvements
Infrastructure
Design
$1,547,692 CJ est. value
Mount Holly, NC 28120

Oak Commerce Center - Building I
New Construction, Infrastructure - 471,860 SF
Bidding
$30,600,000 CJ est. value
Belmont, NC 28056

Highland Branch Greenway Phase I / Gastonia
Infrastructure
Bidding
$750,000 CJ est. value
Gastonia, NC 28052

Oak Commerce Center - Building I
New Construction, Infrastructure - 471,860 SF
Post-Bid
$30,600,000 CJ est. value
Belmont, NC 28056

Project Stingray
New Construction, Infrastructure - 665,722 SF
Post-Bid
$43,300,000 CJ est. value
Gastonia, NC 28052

Water System Extension to Serve Paul Beam Road Area Near Cherryville
Infrastructure
Results
$997,018 CJ est. value
Cherryville, NC 28021

Speed Humps 2022
Infrastructure
Results
$53,684 CJ est. value
Gastonia, NC 28052

Belmont Abbey College
New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Belmont, NC 28012

Howe's Landing
New Construction, Infrastructure
Pending Verification
$340,000,000 CJ est. value
Gastonia, NC 28056

RFQ Engineering - Long Creek Outfall Preliminary Engineering Report (PER)
Renovation, Infrastructure
Pending Verification
$250,000 CJ est. value
Gastonia, NC 28054

FUSE - Silent Crossing at Trenton Street - City of Gastonia
Infrastructure
Conception
$488,878 CJ est. value
Gastonia, NC 28052

Ovata at Blackwood Creek
New Construction, Infrastructure
Design
$29,000,000 CJ est. value
Gastonia, NC 28052

Last Updated 05/03/2023 05:01 PM
Project Title

Premix Inc. Manufacturing Plant

Physical Address View project details and contacts
City, State (County) Dallas, NC 28034   (Gaston County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is under construction.

Details

2 Stories Above Grade, 66,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents