Similar Projects
Guardian Self Storage
New Construction - 119,300 SF
Conception
$8,000,000 to $10,000,000 est. value
Fort Collins, CO 80525

Auto Trends
Addition - 4,750 SF
Conception
Fort Collins, CO 80524

Denrose Court Industrial/Office/R&D Facility
Renovation - 32,870 SF
Design
$1,800,000 est. value
Fort Collins, CO 80524

Construction of the Water Treatment Plant Control Room Modifications
Renovation
Bidding
Loveland, CO 80538

Storage Building Demolition
Demolition
Post-Bid
$25,000 to $100,000 est. value
Fort Collins, CO 80525

Project Sugar
New Construction
Post-Bid
Loveland, CO 80538

CLRD Fort Collins Admin Storage Building
New Construction
Results
$25,000 to $50,000 est. value
Fort Collins, CO 80524

191024A/Foothills Chill Plant - Bid Package #2 Foundations and Metal Building
Results
Fort Collins, CO 80521

Centerra Industrial #7
New Construction - 122,807 SF
Construction
$10,000,000 CJ est. value
Loveland, CO 80538

LifeSpace Loveland - Buildings A, B & C
New Construction - 210,000 SF
Construction
Loveland, CO 80538

Noco RV Rentals
New Construction
Pending Verification
$2,000,000 est. value
Fort Collins, CO 80524

Centerra Industrial Heavy Logistics Centers
New Construction - 3,951,408 SF
Pending Verification
$10,000,000 CJ est. value
Loveland, CO

Gordo Roofing Company Headquarters
New Construction - 22,500 SF
Conception
Fort Collins, CO 80525

2534 Premier Flex Industrial
New Construction - 60,993 SF
Post-Bid
Loveland, CO 80534

Water Treatment Plant Storage Building
Results
Loveland, CO

Last Updated 02/09/2022 03:14 AM
Project Title

Visual Arts A108 Exterior Metal Shelter

Physical Address View project details and contacts
City, State (County) Fort Collins, CO 80523   (Larimer County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Facilities Management at Colorado State University invites competitive documented quote responses to provide and install all materials, equipment and labor for a new metal shed roof over the kiln section of the courtyard in accordance with the project drawings included with this solicitation.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents