Similar Projects
API 653 - Out of Service Tank Inspection - Stewart Lap, Ny.
Bidding
New Windsor, NY

Wastewater Plant Disinfection Improvements
Bidding
Mount Morris, NY

Diesel Storage Tanks and Accessories
Term Contract
Post-Bid
Gilboa, NY 12076

Gas Line Installation at Ulster County Law Enforcement Center
Term Contract
Post-Bid
Kingston, NY 12402

Gas Line Replacement at New Rochelle Train Station
Results
New Rochelle, NY 10801

Roosevelt High School Gas Utility Upgrade Project
Results
Less than $450,000 est. value
Yonkers, NY 10710

Kenmore Mercy Hospital - Fuel Tank-Generator Replacement
Construction
Kenmore, NY 14217

Interior Gas Piping Upgrades at the Enrico Fermi School
Bidding
Yonkers, NY 10701

Maintenance and Repair of Equipment and all Appurtenances of Petroleum Bulk Storage Tanks, including Submersible Pumps of Oil-Water Separators (KS)
Term Contract
Post-Bid
Yonkers, NY 10701

Interlaken Concrete Pad and Propane Tank Relocation
Results
Less than $50,000 est. value
Interlaken, NY 14847

Replacement of Natural Gas Piping at Carpenter Avenue Apartments
Post-Bid
Mount Kisco, NY 10549

Remove/Replace Fuel Oil Tanks at Fishkill CF
Term Contract
Results
$2,500,000 to $5,000,000 est. value
Beacon, NY 12508

Construction of a Shared-Use Fuel Facility
Post-Bid
Ithaca, NY 14850

Underground Fuel Tank Replacement
Results
Schenectady, NY 12305

Tank Tightness Testing
Term Contract
Post-Bid
Mayville, NY 14757

Last Updated 01/24/2020 08:32 AM
Project Title

Reactor Tank Cleaning

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14202   (Erie County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove approximately two feet (12,800 cu ft.) of grit and other debris from each of two four-stage reactors measuring 80 feet by 80 feet. The Bidder is to supply equipment and labor to enter this confined space and complete the cleaning. To be included is the use of vacuum trucks and high pressure washers to breakup grit and wash down tanks as required. Vacuum trucks are to be decanted at the head of treatment plant and grit to be dumped onsite in the ash holding facility.

Details

Division 01 - General Requirements, Cleaning and Waste Management.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents