Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Capital Projects Bond
Renovation, Addition
Conception
Bothell, WA

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

I-405, Brickyard to SR 527 Improvement Project
Infrastructure
Bidding
$525,000,000 CJ est. value
Bellevue, WA 98006

I-405, Brickyard to SR 527 Improvement Project
Infrastructure
Bidding
$525,000,000 CJ est. value
Bellevue, WA 98006

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Results
WA

Douglas Truth Branch Library Access Improvements
Renovation, Infrastructure, Alteration - 18,848 SF
Results
$450,000 to $500,000 est. value
Seattle, WA 98122

Boren Avenue Office Tower
New Construction, Infrastructure - 282,700 SF
Construction
$56,000,000 CJ est. value
Seattle, WA 98101

Boren Avenue Office Tower
New Construction, Infrastructure - 282,700 SF
Construction
$56,000,000 CJ est. value
Seattle, WA 98101

Chapter Buildings
New Construction, Infrastructure - 330,800 SF
Pending Verification
$88,000,000 CJ est. value
Seattle, WA 98105

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

BEX V And BTA V Capital Levy Renovation
Renovation, Addition
Conception
Seattle, WA

Last Updated 04/18/2023 09:11 AM
Project Title

New Evergreen High School - Highline Public Schools Bond

Physical Address View project details and contacts
City, State (County) Burien, WA 98166   (King County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $158,949,154 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New Evergreen High School - Highline Public Schools Bond Evergreen High School 2023 Estimated Cost : $158,949,154 More exact scope details and location to be released at a later date. As of April 2023, the bond election vote was approved in November 2022 construction documents are underway. A general contractor has been selected.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents