Similar Projects
Social and Behavioral Sciences Building - California State University Bakersfield
New Construction, Infrastructure - 49,600 SF
Conception
$35,449,000 CJ est. value
Bakersfield, CA 93311

Student Union Expansion - California State University - Bakersfield
Addition, Infrastructure - 13,900 SF
Conception
$42,476,000 CJ est. value
Bakersfield, CA 93314

AutoZone #6049 / Bakersfield
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Bakersfield, CA 93311

Aquatics Complex - City of Ridgecrest
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Ridgecrest, CA 93555

RFP - Professtional Geotechnical Services for Pinon Street Extension Project
Infrastructure
Bidding
$300,000 CJ est. value
Tehachapi, CA 93561

For Construction On State Highway In Kern County Near Edison From 0.2 Mile West Of Tejon Highway Overcrossing To Caliente Creek Bridge
Infrastructure
Bidding
$10,700,000 CJ est. value
Edison, CA 93307

AutoZone #5666 / Bakersfield - Rebid
New Construction, Infrastructure - 7,000 SF
Post-Bid
$1,500,000 CJ est. value
Bakersfield, CA 93301

RFP Design - Letzring Senior Housing
New Construction, Infrastructure
Post-Bid
$15,000,000 CJ est. value
Bakersfield, CA 93304

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Pavement Rehabilitation 2021-2022
Infrastructure
Results
$1,532,735 CJ est. value
Bakersfield, CA 93307

South Dennison Road Water Main Replacement Project
Infrastructure
Construction
$649,486 CJ est. value
Tehachapi, CA 93561

South Dennison Road Water Main Replacement Project
Infrastructure
Construction
$649,486 CJ est. value
Tehachapi, CA 93561

Taft Highway Hotel and Truck Stop
New Construction, Infrastructure - 20,570 SF
Pending Verification
$6,000,000 CJ est. value
Bakersfield, CA 93307

Towneplace Suites by Marriot / Ridgecrest
New Construction, Infrastructure - 53,666 SF
Pending Verification
$16,000,000 CJ est. value
Ridgecrest, CA 93555

Student Housing Northeast - Phase 3 - California State University - Bakersfield
New Construction, Infrastructure - 120,000 SF
Conception
$67,772,000 CJ est. value
Bakersfield, CA 93314

Last Updated 07/26/2023 09:43 AM
Project Title

Well No. 21 Site Development Project

Physical Address View project details and contacts
City, State (County) Shafter, CA 93263   (Kern County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,985,981 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified below in COMPONENT PARTS OF THE CONTRACT, for the following Project: WELL NO. 21 SITE DEVELOPMENT PROJECT The Contractor and its surety shall be liable to the City for any damages arising as a result of the Contractors failure to comply with this obligation. Contract shall provide all labor, materials, and equipment and perform all operations for Municipal Well No. 21 development. Pre-Qualification for Bidders: Required License Type Required: A Project Duration: 180 Calendar Days Liquidated Damages: $500.00 Per Calendar Day *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents