Similar Projects
Roofing Requirement at Fort Drum.
Design
$10,000,000 to $25,000,000 est. value
Fort Drum, NY

ITB Building Roof Replacement
Alteration
Bidding
New York, NY 10010

Woodhull 5th Floor Roof Replacement
Alteration
Bidding
Brooklyn, NY 11206

Roof Repairs
Term Contract
Post-Bid
Rochester, NY 14609

Repair/Replacement of the Roof of the Wallace Hill Fire Station
Post-Bid
Plattsburgh, NY 12901

Replace Roofing, Building 132 at Attica CF
Results
$500,000 to $1,000,000 est. value
Attica, NY 14011

Replace Roofs, Buildings 1, 2, 4 and 110B at Bedford Hills CF
Results
$1,000,000 to $2,000,000 est. value
Bedford Hills, NY 10507

Roof Improvements - Cohalan Family Court
Alteration
Bidding
Central Islip, NY 11722

Town Hall Roof Replacement
Post-Bid
$75,000 to $85,000 est. value
Albion, NY 14411

Roof Reconstruction Project 2019-2020 at Cairo-Durham Elementary School
Results
Cairo, NY 12413

Parapet Wall Roof Repair
Alteration
Bidding
Buffalo, NY 14225

Roof Repair Services
Term Contract
Post-Bid
Greece, NY 14515

Pirnie Upper Envelope Project - Alexander Pirnie Federal Building
Results
Utica, NY

Latta Road IRA Roof Replacement
Alteration
Bidding
Less than $50,000 est. value
Rochester, NY 14612

Roofing Preventive Maintenance and Repair Service
Term Contract
Post-Bid
Troy, NY 12180

Last Updated 10/19/2021 10:54 AM
Project Title

Cobblestone IRA Roof Replacement

Physical Address View project details and contacts
City, State (County) Newark, NY 14513   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the entire Roof System over Residence. Includes, but is not necessarily limited to the following: 1.Remove the existing asphalt shingle roofing system complete down to the existing wood decking. Any damaged decking will be quoted and result in a change order. 2.Provide and install a new 30-year asphalt shingle roofing system complete, including all flashings, underlayment’s, ice barriers, venting, accessories, and other roofing materials as required for a complete system. 3.Remove and replace exhaust vent covers as per existing, typical. 4.Remove and replace drip edge at all eaves and gables, typical. 5.Flash all penetrations, typical. 6.Remove and replace ridge vents on all ridges, typical. 7.No asbestos-containing materials may be used.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents