Similar Projects
Building 1 Improvements in Center Strafford
Infrastructure
Bidding
$407,073 CJ est. value
Concord, NH 03301

Bleacher Concrete Pad
Alteration
Post-Bid
Windham, NH 03087

Bellamy Ridge (Red Barn Drive) Completion
Infrastructure
Post-Bid
$700,000 CJ est. value
Dover, NH 03820

Highway Department Items - Block and Concrete Products
Term Contract
Results
Pelham, NH

Greenfield State Park Pot Washing Stations Slabs and Firewood Shed Foundation
Alteration
Results
Greenfield, NH 03047

Concrete (Delivered and/or Pumped)
Term Contract
Post-Bid
Concord, NH 03301

Precast Concrete Structures
Alteration
Results
Dover, NH

Concrete (Delivered and/or Pumped)
Term Contract
Post-Bid
Concord, NH 03301

Tara Estates Sewer Pump Station Upgrade
Renovation
Results
$1,376,500 CJ est. value
Rochester, NH 03867

Signal / ITS Prime
Infrastructure
Post-Bid
$2,186,825 CJ est. value
Concord, NH 03301

1.5 MG Water Storage Tank Rehabilitation
Renovation
Results
$519,049 CJ est. value
Swanzey, NH 03446

Concrete (Delivered and/or Pumped)
Term Contract
Post-Bid
Concord, NH 03301

Poverty Lane Paving
Infrastructure
Results
$338,664 CJ est. value
Lebanon, NH 03766

Frost Free Library Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$1,209,932 CJ est. value
Marlborough, NH 03455

Epoxy Applications - MCDOC Renovation Project
Renovation
Results
$60,128 CJ est. value
Boscawen, NH 03303

Last Updated 05/23/2023 02:05 PM
Project Title

University of New Hampshire Law Renovations - Student Services Corridor Connector Project

Physical Address View project details and contacts
City, State (County) Concord, NH 03301   (Merrimack County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status No longer Accepting Requests, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Schedule: Construction Begins 06/01/2023 Construction Complete 08/31/2023 Each bid must be accompanied by a bid bond, bank draft or certified check in an amount not less than five percent (5%) of the base bid.Within ten (10) days after the formal opening of bids, bid securities in the form of bank drafts and certified checks will be returned to all except the three (3) lowest bidders. Except for the successful bidder, bid securities in the form of bank drafts and certified checks of the three lowest bidders will be returned within three (3) days after the execution of the contract. The successful bidder's bid security will be returned upon delivery of satisfactory one hundred percent (100%) performance and payment bonds. Question Submission Close Date 5/9/2023 12:00 PM EDT

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents