Similar Projects
Last Updated | 07/27/2021 08:51 AM |
Project Title | Rabbit Creek Lift Station Improvements |
Physical Address | View project details and contacts |
City, State (County) | Kilgore, TX (Gregg County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $3,300,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of performing Rabbit Creek Lift Station Improvements including but not limited to, mobilization, bonds and insurance; demolition of the existing wet well top slab; construction of a new wet well top slab; three (3) submersible pumps with accessories, piping, valves, fittings, and supports; protective coatings; elevated transformer walkway; one (1) 400 kW diesel engine driven generator; sound attenuated weatherproof level 2 enclosure; elevated electrical equipment and generator walkway; automatic transfer switch, distribution panel, SCADA panel, electrical service disconnect switches, VFDs, conduit, wire and associated piping; site work; and all else shown on the construction drawings and detailed in the specifications for a fully functioning lift station. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |