Similar Projects
Asphalt Overlay of One Section of Westpoint Road
Infrastructure
Bidding
$400,000 est. value
Monticello, WI 53570

2021 Utility Improvement - Street Reconstruction - Asphalt Paving
Infrastructure
Post-Bid
Monroe, WI

Roadwork
Infrastructure
Post-Bid
$400,000 est. value
Monroe, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Beloit - Evansville, Br. Allen Creek, B-53-0293, Monroe - Evansville, STH 213 - Garrison Drive
Results
Beloit, Evansville, Monroe, WI 53536

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

New Glarus - Verona, South County Line - Gehin Street
Results
New Glarus, Verona, WI

Asphalt Overlay
Infrastructure
Post-Bid
$500,000 est. value
WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

2022 Town of Mount Pleasant Road Rehabilitation - Schneeberger Road
Infrastructure
Post-Bid
$700,000 est. value
Mount Pleasant, WI

2021 Seal Coat
Infrastructure
Results
Brodhead, WI

Brodhead - Janesville, STH 104 to CTH B; C. Brodhead, 1st Street, 2nd Street to STH 104; Brodhead - Janesville, Tributary Structure
Infrastructure
Results
Brodhead, Janesville, WI

Crack Seal, Micro-Surfacing, Slurry Leveling, and Pavement Marking
Infrastructure
Results
Burlington, Clintonville, Eagle River, Monroe, Osceola, Shell Lake, Sturgeon Bay, Waukesha, Waupaca, Wisconsin Rapids, WI

Ninth Avenue Improvements
Infrastructure
Results
New Glarus, WI 53574

2022 Utility Improvement - Street Reconstruction - Asphalt Paving
Infrastructure
Results
Monroe, WI

Last Updated 07/15/2022 09:10 AM
Project Title

Schneeberger Road Reconditioning

Physical Address View project details and contacts
City, State (County) Monticello, WI   (Green County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $130,000 to $180,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of pulverizing the existing pavement on Schneeberger Road from Purintun Road to Zurfluh Road, undercutting areas of poor subgrade, repaving the mainline road, and restoration of driveway aprons and shoulders to match the new road profile. The overall rehabilitation work includes the following approximate quantities: 18,750 SY asphalt pulverization, 3,200 tons of hot mix asphalt, removal and replacement of concrete and asphalt driveway aprons, installation of 14,500 lineal feet of gravel shoulders, and restoration of the work area and other miscellaneous items in conformance with the Contract Documents. Est. Value Notes: 130,000-180,000. All Bids shall be uploaded and submitted through Quest only with EJCDC C-430 Bid Bond equal to of the Bid payable to the OWNER. All Bids uploaded and submitted through Quest shall also be accompanied with Bid Form 00 41 43.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents