Similar Projects
Stein Bridge Repair
New Construction, Infrastructure
Bidding
Aspen, CO

Sh 64 West of Meeker Bridge d-03-a & d-04-g
New Construction, Infrastructure
Bidding
$5,000,000 to $20,000,000 est. value
CO

Rio Blanco County Bridge Maintenance
Post-Bid
Meeker, CO 81641

2021 Wildin Bridge Repair and Decking Replacement
Post-Bid
Aspen, CO 81611

Y--SJCP OSO Bridge and Culverts
Results
$1,000,000 to $5,000,000 est. value
CO

Bridge Inspection, Maintenance, Repair and Replacement
Term Contract
Results
Fort Collins, CO 80522

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

Depot Bridge
New Construction
Bidding
Brighton, CO 80601

MESA-58-M.6 Bridge Replacement Project
Post-Bid
Grand Junction, CO 81502

Park Avenue Viaduct Preventative Maintenance Phase 2
Results
$14,300,000 to $15,400,000 est. value
Denver, CO 80202

Heil Valley Ranch Trail Bridges Engineering/Design Services
Renovation, Infrastructure
Bidding
CO

Paseo Bridge Replacement and Trail Improvements Project
Post-Bid
Colorado Springs, CO 80903

Maroon Creek Trail Bridge
Results
$100,000 to $240,000 est. value
Aurora, CO 81611

Removing and Replacing Existing Asphalt on Bridges, Removing Portions of Present Structure (Class 2 and 3)
New Construction, Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value

Beckers Lane Bridge Replacement
Post-Bid
Manitou Springs, CO 80829

Last Updated 01/17/2022 01:48 AM
Project Title

Bridge Replacement Project

Physical Address View project details and contacts
City, State (County) Sterling, CO   (Logan County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project in general consists of the construction of a bridge crossing the South Platte River on Logan County Road 93 between SH 138 and I-76, east of Crook, Colorado. The construction will include the construction of a 250 ft precast concrete (BT45), installation of a precast concrete box culvert, unclassified excavation, embankment, aggregate base course placement, etc. and other required work.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents