Similar Projects
High-Tech Logistics Park / Mobile
New Construction, Infrastructure
Conception
$19,000,000 CJ est. value
Mobile, AL 36602

Langan Lake Dredging
Infrastructure
Conception
$4,000,000 CJ est. value
Mobile, AL 36602

Ball Healthcare Skilled Nursing Facility / Mobile
New Construction, Infrastructure
Design
$52,000,000 CJ est. value
Mobile, AL 36602

Canfor Southern Pines Sawmill Complex / Mobile County
New Construction, Infrastructure
Design
$210,000,000 CJ est. value
Axis, AL 36505

North Drive Traffic Circle Repaving
Infrastructure
Bidding
$300,000 CJ est. value
Mobile, AL 36605

Mobile Area Water and Sewer Service (MAWSS) Eslava Creek Trunk Upgrades
Infrastructure
Bidding
$300,000 CJ est. value
Mobile, AL 36618

Alabama Cruise Terminal SPBB Gangway Improvements
Infrastructure
Post-Bid
$700,000 CJ est. value
Mobile, AL 36602

Fox Landing Boat Wash Facility- Civil Site Work
Infrastructure
Post-Bid
$200,000 CJ est. value
Semmes, AL 36575

Water Supply Improvements Contract A -R. O. Water Treatment Plant (0.250 MGD) Contract B --R. O. Treatment Equipment
New Construction, Infrastructure
Results
$2,145,057 CJ est. value
Mobile, AL 36602

Saraland Tennis Bathroom Building
New Construction
Results
Saraland, AL

Barry 8 Power Plant Natural Gas Unit
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Bucks, AL 36512

Head Start Center / Mobile
New Construction, Infrastructure - 8,400 SF
Construction
$2,000,000 CJ est. value
Mobile, AL 36619

FGP Holdings Manufacturing Renovation
Addition, Demolition, Infrastructure - 100,000 SF
Pending Verification
$20,000,000 CJ est. value
Mobile, AL 36606

RFP - I-10 Mobile River Bridge Project
New Construction, Infrastructure
Pending Verification
$1,600,000,000 CJ est. value
Mobile, AL 36602

Africatown Historic Structures Restoration, Scott Building
Demolition, New Construction, Infrastructure
Design
$600,000 CJ est. value
Mobile, AL 36610

Last Updated 07/12/2023 11:47 AM
Project Title

UMS Wright Prep School Classroom Building

Physical Address View project details and contacts
City, State (County) Mobile, AL 36607   (Mobile County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Park/Playground, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 12, 2023, the owner is seeking plan approvals from the City of Mobile. The Architect is selected, but contact information is not disclosed. General Contractor is selected. Construction start is expected third quarter 2024.

Details

Parking Spaces, 21 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents